AVEVA B2B Case Studies & Customer Successes

AVEVA logo

AVEVA is a global leader in engineering and industrial software. Their expertise and innovation have put them at the heart of the world’s most ambitious projects, biggest companies, and greatest challenges. AVEVA, combined with Schneider Electric’s industrial software business, creates an unmatched organization and end-to-end portfolio focused on driving digital transformation across the entire asset and operational life cycles to maximize return on capital and improve profitability.

Case Studies

Showing 170 AVEVA Customer Success Stories

search button

Abu Dhabi National Oil Company (ADNOC) achieves $60–100M in operational savings and unified operations with AVEVA's Unified Operations Center

Abu Dhabi National Oil Company (ADNOC) logo

Adani Transmission achieves 40% faster, precision tower designs with AVEVA Bocad

Adani Transmission logo

African Explosives Limited achieves accurate traceability and improved product quality with AVEVA (Wonderware Equipment Operations Module)

African Explosives Limited logo

Aibel delivers Johan Sverdrup drilling platform on time and under budget with AVEVA PDMS/E3D

Aibel logo

Airbus Helicopters achieves 40% efficiency gains and halves testing development time with AVEVA System Platform

Airbus Helicopters logo

Almaz Central Marine Design Bureau achieves faster hull construction and significant cost savings with AVEVA Marine

Almaz Central Marine Design Bureau logo

Amadori achieves precise temperature control, traceability and energy savings with AVEVA (Wonderware)

Amadori logo

Amalgamated Beverage Industries achieves improved packaging line performance and accurate real-time downtime reporting with AVEVA (Wonderware)

Amalgamated Beverage Industries logo

Ambiensys achieves up to 80% solid waste reduction and centralized GeiserBox control with AVEVA Wonderware

Ambiensys logo

AMEC (consultancy, engineering & project management supplier) achieves streamlined engineering data management and automated document generation with AVEVA

AMEC logo

AngloGold Ashanti Limited achieves standardized, remotely supported intelligent operations and improved production efficiency with AVEVA

AngloGold Ashanti Limited logo

Apply Sørco achieves up to 30% efficiency gains and major man‑hour reductions with AVEVA Everything3D (AVEVA)

Apply Sørco logo

AREVA achieves streamlined engineering and real-time global collaboration with AVEVA Engineering

Areva logo

AREVA achieves on-time delivery of a landmark EPR and global multi-site collaboration with AVEVA Plant IMS

Areva logo

Ascend Performance Materials achieves $3.5M+ in cost savings and real-time Visual Factory visibility with AVEVA

Ascend Performance Materials logo

Ash Grove Cement achieves $2M first-year inventory reduction and improved asset availability with AVEVA Avantis EAM

Ash Grove Cement logo

Assmang Limited achieves rapid commissioning and standards-driven, scalable mine operations with AVEVA's Wonderware System Platform

Assmang Limited logo

Astron Energy achieves 50% faster crude assay creation and improved refinery margins with AVEVA Unified Supply Chain

Astron Energy logo

Atkins achieves 40% faster design efficiency with AVEVA E3D (AVEVA)

Atkins logo

Auto-Bake achieves increased uptime and faster changeovers with AVEVA's Wonderware InTouch HMI

Auto-Bake logo

Avenue2 achieves 80% peak‑hour congestion reduction and National Tunnel Standard compliance for Europe’s first double‑decker tunnel with AVEVA

Avenue2 logo

AVIC International achieves improved efficiency, collaboration and high-value vessel design with AVEVA

AVIC International logo

Azbil (customer) achieves approximately 50% sales growth with AVEVA (solution provider)

Azbil logo

Baltika Breweries achieves lower energy use, reduced production losses and real-time process control with AVEVA's Wonderware MES

Baltika Breweries logo

Barcelona City Council achieves smart, sustainable resource and water management with AVEVA System Platform & InTouch HMI

Barcelona City Council logo

Barcelona-El Prat International Airport achieves integrated, scalable and cost-efficient control of 700,000+ signals with AVEVA

Barcelona-El Prat International Airport logo

Baxter doubles manufacturing productivity and achieves FDA-compliant traceability with AVEVA (Wonderware)

Baxter logo

Bayer Crop Science achieves increased plant-treatment productivity and automated greenhouse spraying with AVEVA (Wonderware)

Bayer Crop Science logo

Bermuda Electric Light Company (BELCO) achieves consistent island-wide power and ISO 14001 certification with AVEVA

BELCO logo

Black Rock Mine Operations achieves centralised operations and near‑double‑digit productivity gains with AVEVA

Black Rock Mine Operations logo

BLOM Maritime cuts Bills of Material by 35% and installation time by 25% with AVEVA E3D

BLOM Maritime AS logo

Bluewater achieves on-time First Oil and modernized ICSS with AVEVA

Bluewater logo

Bodycote achieves consistent HIP processing and proactive maintenance with AVEVA (Wonderware)

Bodycote logo

Boise Cascade achieves 10% fuel savings and streamlined regulatory reporting with AVEVA (Wonderware)

Boise Cascade logo

BP Norway achieves more efficient, compliant asset operations with AVEVA's asset life cycle information management solution

BP Norway logo

BP revolutionizes its Oil & Gas downstream business with AVEVA’s solution in the cloud

BP Norway logo

Branston achieves 90% water recycling and cost and environmental savings with AVEVA System Platform

Branston logo

Brisa Bridgestone Sabanci achieves accurate production control and performance measurement with AVEVA (Wonderware)

Brisa Bridgestone Sabanci logo

BSH Hausgeräte achieves automated OEE data collection and reduced cycle times with AVEVA (Wonderware MES)

BSH Hausgeräte logo

Cairns Water achieves faster response and centralized SCADA control with AVEVA (Wonderware)

Cairns Water logo

Carson City Public Works achieves 15% reduction in operations staff hours and improved operational readiness with AVEVA

Carson City Public Works logo

Cascades Tissue Group achieves improved product quality and operating efficiencies with AVEVA

Cascades Tissue Group logo

Castle Peak Power achieves optimal performance and reduced maintenance with AVEVA

Castle Peak Power logo

CF Industries (North American fertilizer producer) achieves major cost reductions and rapid maintenance analytics with AVEVA Avantis.PRO & Avantis.DSS

CF Industries logo

CFE Mexico achieves Smart Grid modernization and real-time substation control with AVEVA

CFE Mexico logo

Chantier Davie boosts efficiency and meets tight shipbuilding deadlines with AVEVA ERM & AVEVA Marine

Chantier Davie logo

Chevron Oronite Company LLC achieves process standardization, improved reliability and $3–5M annual savings with AVEVA (Wonderware IntelaTrac)

Chevron Oronite Company LLC logo

China Ministry of Railways achieves nationwide high‑speed rail integration and a centralized Passenger Information System with AVEVA

China Ministry of Railways logo

City of Boise achieves 50% more phosphorus removal with AVEVA System Platform

City of Boise logo

City of Bremen achieves 15–18% energy savings and centralized building management with AVEVA

City of Bremen logo

City of Thunder Bay achieves 25M gallons/day capacity expansion, rapid ROI and improved operational efficiency with AVEVA

City of Thunder Bay logo

City of Toronto increases productivity and reduces maintenance costs with AVEVA Avantis.PRO Enterprise Asset Management

City of Toronto logo

Clif Bar achieves 75% self-manufacturing and standardized operations with AVEVA Wonderware MES & Historian

Clif Bar logo

Confidence Steel Ltd achieves 40% faster drawing generation and error‑free fabrication with AVEVA Bocad (AVEVA)

Confidence Steel Ltd logo

Cray Valley achieves rapid, scalable automation migration with AVEVA Wonderware System Platform

Cray Valley logo

Damodar Valley Corporation achieves digitisation and reduced unplanned downtime with AVEVA

Damodar Valley Corporation logo

Debswana achieves real-time production reporting and automated data capture with AVEVA

Debswana logo

Deltamarin achieves streamlined ship design and fewer fabrication errors with AVEVA Marine

Deltamarin logo

Det Norske achieves reduced handover costs and accelerated operational readiness with AVEVA's Progressive Handover solution

Det Norske logo

DiGeronimo Aggregates achieves $100,000+ in energy and maintenance savings, improved kiln control and EPA compliance with AVEVA (Wonderware)

DiGeronimo Aggregates logo

Dragados Offshore S.A. achieves faster time to market and more efficient steel detailing with AVEVA Bocad

Dragados Offshore S.A. logo

Echelon Corporation achieves 40% energy reduction and $30,000 annual demand-response savings with AVEVA (Wonderware InTouch HMI)

Echelon Corporation logo

Ecocity Valdespartera Zaragoza achieves Spain’s first sustainable "Smart City" with AVEVA integrated monitoring and control solutions

Ecocity Valdespartera Zaragoza logo

Eker Dairies achieves automated production, higher capacity and full traceability with AVEVA

Eker logo

Eskom Lethabo Power Station achieves improved safety, efficiency and lower operating costs with AVEVA DYNSIM

Eskom Lethabo Power Station logo

F&N Dairies achieves 3 million cans/day production and 1-minute quality traceability with AVEVA Manufacturing Execution System

F&N Dairies logo

Farchioni Olii achieves consistent product quality and smart factory automation with AVEVA

Farchioni Olii logo

Fauji Fertilizer Company achieves faster operator training and reduced unscheduled shutdowns with AVEVA

Fauji Fertilizer Company logo

Federal University of Campina Grande achieves immersive, industry-ready process simulation training with AVEVA (PRO/II, DYNSIM, SimCentral)

Federal University of Campina Grande logo

Total Control and Visibility for the CuttingEdge Process of Ambiensys “GeiserBox” Urban Waste Management Solutions

Ferrocarrils de la Generalitat de Catalunya logo

Fujirebio Diagnostics, Inc. achieves paperless GMP compliance and saves 1,100 man‑hours/year with AVEVA

Fujirebio Diagnostics, Inc. logo

FZETA achieves market-leading structural steel design and reduced rework with AVEVA Bocad

FZETA logo

AVEVA Improves GenOn Power Station Operational Efficiency & Enhances Workforce Enablement

GenOn Energy logo

GHENOVA achieves faster design cycles and accurate model delivery with AVEVA Marine

GHENOVA logo

Giprogazoochistka Group achieves sixfold project delivery and unified 3D-linked engineering data with AVEVA IE&D

Giprogazoochistka Group logo

Gori achieves centralized remote control of 500 plants and 45% energy savings with AVEVA

Gori logo

Government of Chhattisgarh achieves India’s first greenfield smart city platform with AVEVA

Government of Chhattisgarh logo

Hanla NMT achieves 30% time savings in BWTS retrofit planning with AVEVA Everything3D

Hanla NMT logo

Hawaiian Commercial and Sugar Company boosts efficiency and retains cost-competitive edge with AVEVA

Hawaiian Commercial and Sugar Company logo

Hendrick Motorsports achieves $1.565M in inventory and operational savings and centralizes multi-site asset management with AVEVA Asset Management

Hendrick Motorsports logo

Henkel AG & Co. achieves 9% energy reduction and €15M savings with AVEVA

Henkel AG & Co. logo

Hennig-Olsen achieves real-time visibility and control of ice cream production with AVEVA's Wonderware MES

Hennig-Olsen logo

Hamburger Hafen und Logistik AG (HHLA) doubles container capacity and centralizes terminal control with AVEVA Wonderware System Platform

HHLA logo

IHB ShipDesign AD achieves up to 20% faster BWTS retrofit design and reduced rework with AVEVA E3D and laser scanning

IHB ShipDesign AD logo

Industrialesud S.p.A. achieves automated, error‑free, quality‑compliant production with AVEVA (Wonderware) solutions

Industrialesud S.p.A. logo

Infineum achieves over 90% plant availability with AVEVA IntelaTrac Mobile Operator Rounds

Infineum logo

Ingersoll Rand achieves dramatic energy and cost savings on compressed-air production with AVEVA (Wonderware InTouch HMI)

Ingersoll Rand logo

Intermountain Power Service Corporation avoids $1M/day outages and validates DCS controls with AVEVA DYNSIM‑Power

Intermountain Power Service Corporation logo

Italpresse Gauss achieves new revenue streams and remote AR/VR maintenance with AVEVA

Italpresse Gauss logo

JSC Bashkir Soda Co. achieves real-time production control and reduced material loss with AVEVA

JSC Bashkir Soda Co. logo

Kalundborg Forsyning achieves real-time network visibility and faster emergency response with AVEVA's Aquis Water Network Management

Kalundborg Forsyning logo

KTY Engenharia achieves improved design accuracy, integrated data and rapid cable routing with AVEVA

KTY Engenharia logo

Kuwait Oil Company achieves automated, integrated refinery operations and up to 10% operating cost reduction with AVEVA software

Kuwait Oil Company logo

L&T Hydrocarbon achieves a single-point information repository and integrated engineering with AVEVA

L&T Hydrocarbon logo

La Tortilla Factory achieves 5% yield improvement and real-time process visibility with AVEVA

La Tortilla Factory logo

Lassila & Tikanoja achieves 20% increase in operating time with AVEVA System Platform

Lassila and Tikanoja logo

Long Beach Water Department achieves $300,000 annual return and improved operational efficiency with AVEVA SCADA solution

Long Beach Water Department logo

Lonmin Mining achieves R300 million annual savings and centralized operations with AVEVA System Platform

Lonmin Mining logo

Magna Automotive achieves 8% productivity gain and zero downtime with AVEVA (Wonderware System Platform)

Magna Automotive logo

Meteng Pty Ltd achieves accelerated plant design, realistic operator training and major engineering cost savings with AVEVA (Wonderware) software

Meteng Pty Ltd logo

Mitsui achieves 30% reduction in design lead time with AVEVA Marine

Mitsui logo

MMG Limited achieves 10%+ asset utilisation increase and major productivity gains with AVEVA Ampla Operations Management

MMG Limited logo

Museumsinsel Berlin achieves centralized, real-time facilities management across all Museum Island sites with AVEVA (Wonderware)

Museumsinsel Berlin logo

Namibia Breweries Limited achieves energy savings, CO2 reduction and improved production visibility with AVEVA Historian

Namibia Breweries Limited logo

Nanjing Metro achieves efficient, scalable, energy-saving operations with AVEVA (Wonderware)

Nanjing Metro logo

New Belgium Brewing Co. boosts OEE, halves downtime, and hits record production with AVEVA MES Performance

New Belgium Brewing Co. logo

New Hospital of Orléans achieves patient comfort, energy efficiency and 5‑second incident response with AVEVA System Platform

NIIK achieves faster, safer, right‑first‑time plant design and change management with AVEVA

NIIK logo

NIS AD achieves centralized system control and 20% staff cost reduction with AVEVA

NIS AD logo

Norfolk Southern Railway reduces labor costs and boosts yard efficiency with AVEVA (Wonderware InTouch HMI)

Norfolk Southern Railway logo

Oceana Shipyard achieves streamlined production and reduced costs with AVEVA ERM (AVEVA)

Oceana Shipyard logo

OKG halves reactor outage time to under 80 days with AVEVA Everything3D

OKG logo

Ontario Clean Water Agency achieves scalable, compliant and faster clean water delivery with AVEVA System Platform

Ontario Clean Water Agency logo

Oranjevis achieves 20% production increase and 80% fewer operator monitors with AVEVA

Orley Foods achieves full product traceability and reduced fat usage with AVEVA (Wonderware System Platform)

Orley Foods logo

Oulu Mining School prepares industry-ready mining graduates with AVEVA

Oulu Mining School logo

Ølgod Tekniske Værker achieves accurate water-flow visibility and rapid contamination response with AVEVA Aquis Water Network Management

Ølgod Tekniske Værker logo

Palace of Versailles achieves unified real-time operations and faster maintenance with AVEVA

Pepsi Bottling Ventures achieves reduced downtime and improved line efficiency with AVEVA

Pepsi Bottling Ventures logo

Pepsi Bottling Ventures achieves 50% reduction in changeover time, 10% line efficiency gain and under-1-year payback with AVEVA

Pepsi Bottling Ventures logo

Pima County Doubles Plant Capacity and Boosts Operational Efficiency With AVEVA

Pima County logo

Pinellas County achieves 30–40% faster engineering and real-time plant visibility with AVEVA (Wonderware)

Pinellas County logo

Plascon Paints achieves improved batch consistency and productivity with AVEVA

Plascon Paints logo

PML Exploration Services achieves real-time, safer and more efficient well drilling with AVEVA InTouch Edge HMI

PML Exploration Services logo

Port of Portland achieves streamlined operations, 65% inventory reduction and $250K first-year savings with AVEVA Avantis.PRO

Port of Portland logo

Portland General Electric achieves reliable peak-load management and significant cost savings with AVEVA

Portland General Electric logo

Promon Engenharia eliminates downtime and boosts design productivity with AVEVA Instrumentation

Promon Engenharia logo

Promon Engenharia achieves a 15% reduction in engineering hours and 60% faster project implementation with AVEVA SimCentral (AVEVA)

Promon Engenharia logo

Puerto Rico Water and Sewage Authority achieves increased water output and customer satisfaction with AVEVA

Puerto Rico Water and Sewage Authority logo

PVC Compounders LLC achieves under 1% internal failures and 15–20% less downtime with AVEVA (Wonderware System Platform)

Richards Bay Coal Terminal cuts costs and downtime with AVEVA (Wonderware) thin-client SCADA

Richards Bay Coal Terminal Co. logo

Rishabh Engineering Services achieves 25% faster modelling and 99% scope accuracy with AVEVA 3D Plant Design Software

Rishabh Engineering Services logo

Roy Hill achieves real-time pit-to-port optimization with AVEVA

Roy Hill logo

Sakhalin Energy Investment Company, Ltd. achieves streamlined contracts and full transparency with AVEVA ProCon (AVEVA)

Sakhalin Energy Investment Company, Ltd. logo

Salt River Project achieves 44% fewer configured alarms and faster plant start-ups with AVEVA

Salt River Project logo

Sandbags achieves increased production efficiency and nationwide remote monitoring with AVEVA InTouch Edge HMI

Sandbags logo

Schlattner achieves 400 MW climate‑neutral North Sea windfarm with AVEVA Bocad Steel

Seminole County achieves real-time mobile monitoring and safe drinking water for 440,000 with AVEVA SmartGlance Mobile Reports

Seminole County logo

Shanghai Environmental Group achieves clash-free, faster construction and seamless digital handover with AVEVA 3D Plant Design & AVEVA NET

SIA Abrasives Industries achieves paperless, real-time production control with AVEVA (Wonderware)

SIA Abrasives Industries logo

Southern Mississippi Electric Power Association (SMEPA) achieves up to 1.5% heat-rate improvement and <1-year payback with AVEVA Connoisseur optimization

SMEPA logo

Società Autostrada Ligure Toscana achieves safer, lower-cost A12 motorway operations with AVEVA Wonderware

Società Autostrada Ligure Toscana logo

Società Risorse Idriche Calabresi reduces water waste and achieves immediate ROI with AVEVA (Wonderware)

Società Risorse Idriche Calabresi logo

Spokane Water Department achieves scalable, easy-to-manage SCADA and two-thirds fewer site visits with AVEVA

Spokane Water Department logo

ST Powder Coatings Spa achieves 30% productivity gain and rapid ERP-to-plant integration to fill thousands of custom orders daily with AVEVA (Wonderware)

St Powder Coatings Spa logo

Stadtwerke Düsseldorf achieves automated control, reduced operating costs and in-house reporting with AVEVA

Stadtwerke Düsseldorf logo

Tata Power achieves early equipment-failure detection and reduced unplanned downtime with AVEVA PRiSM Predictive Asset Analytics

Tata Power logo

TECHNOEDIF Engenharia achieves time and cost savings with AVEVA Instrumentation (AVEVA)

TECHNOEDIF Engenharia logo

Tekfen Engineering achieves faster, lower-cost project delivery with AVEVA E3D (AVEVA)

Tekfen Engineering logo

TekSolv achieves minutes-scale project deployment and real-time remote monitoring with AVEVA (Wonderware)

TekSolv logo

The Venetian and Palazzo Resort Hotels and Casino achieve non-stop power and real-time facilities management with AVEVA

The Venetian and Palazzo Resort Hotels and Casino logo

Thomson Technology achieves 50–60% reduction in HMI programming time with AVEVA InTouch Edge HMI

Thomson Technology logo

Total OLEUM achieves scalable, cloud-based operator training—cutting time from months to weeks and supporting 2,000 trainees/year with AVEVA OTS

Total OLEUM logo

Transnet achieves streamlined conveyor routing and real-time shipment tracking with AVEVA (Wonderware)

Transnet logo

UC/DALKIA achieves user-friendly chilled-water supervision and energy savings with AVEVA (ArchestrA System Platform & InTouch HMI)

UC/DALKIA logo

University of Strasbourg achieves centralized, real-time management of 140 buildings with AVEVA (Wonderware System Platform)

University of Strasbourg logo

Vaasan Vesi achieves higher reliability and uninterrupted water services with AVEVA (Wonderware) solution

Vaasan Vesi logo

Valmet Automotive achieves rapid 3-month production ramp-up and real-time MES visibility with AVEVA

Valmet Automotive logo

Vectren Corporation achieves lower maintenance costs, better asset tracking and higher availability with AVEVA Avantis asset management

Vectren Corporation logo

Vista Projects achieves 16% under‑budget project delivery with AVEVA Integrated Engineering & Design

Vista Projects logo

Viterra achieves 10% faster shipping and 40% reduced rail receiving time with AVEVA System Platform

Viterra logo

WaterForce achieves remote irrigation monitoring, operational agility and up to 50% energy savings with AVEVA

WaterForce logo

Weldwood of Canada achieves lower operating costs and higher production efficiency with AVEVA Avantis.PRO Enterprise Asset Management

Western Refining optimizes plant asset availability with AVEVA Avantis.PRO Enterprise Asset Management

Western Refining logo

Westshore Terminals achieves zero-downtime upgrade, 29M-ton throughput and real-time data access with AVEVA (Wonderware) System Platform

Westshore Terminals logo

Woodlands Dairy (Pty) Ltd achieves ISO 22000 compliance and improved production monitoring with AVEVA (Wonderware System Platform)

Woodlands Dairy (Pty) Ltd logo

Wuxi city achieves efficient remote monitoring and faster emergency response for its transportation tunnel system with AVEVA (Wonderware)

Wuxi logo

Xcellerex achieves significant cost and time-to-market reductions with AVEVA (Wonderware)

Xcellerex logo

Yamal LNG achieves six months' preparatory savings and faster start-up with AVEVA

Yamal LNG logo

Yellow River Conservancy Commission reduces engineering time, cost and effort and improves water regulation with AVEVA

Yellow River Conservancy Commission logo

No matching case studies