Case Study: Tekfen Engineering achieves faster, lower-cost project delivery with AVEVA E3D (AVEVA)

A AVEVA Case Study

Preview of the Tekfen Engineering Case Study

International Turkish company, Tekfen Engineering, chose AVEVA to mitigate issues caused by working across countries, time zones, and language barriers

Tekfen Engineering, an international engineering contractor working across Turkey, the Middle East, Africa and beyond, faced challenges visualizing 3D designs, relied on time‑consuming face‑to‑face meetings to verify iterations, and struggled with complex document control while collaborating across time zones and languages. Already using AVEVA PDMS, Tekfen sought a smooth, low‑risk move to a dynamic design environment and adopted AVEVA Everything3D (AVEVA E3D) from AVEVA to bring together 3D models, laser data and better ERP integration.

AVEVA rapidly deployed AVEVA E3D and completed the migration of PDMS projects in under ten weeks; the solution delivered clash‑free, multi‑discipline 3D design, automatic engineering‑drawing generation and laser‑scan integration. As a result, Tekfen reduced effort, errors and costly rework, accelerated project delivery, improved multi‑company collaboration, and can now deliver more projects with the same resources—boosting revenue and profitability.


Open case study document...

Tekfen Engineering

Tolga Timirci

Piping and Plant Design Department Manager


AVEVA