Case Study: NIIK achieves faster, safer, right‑first‑time plant design and change management with AVEVA

A AVEVA Case Study

Preview of the NIIK Case Study

NIIK utilized many AVEVA programs to increase communication between departments and speed up changes to its engineering services such as feasibility studies and design documentation of urea plants

NIIK, a leading Russian engineering firm for grassroots and revamp urea plants, needed to improve change management, cross‑department collaboration and visibility at the design supervision stage to boost safety, operator confidence and on‑time delivery. To achieve this, NIIK implemented AVEVA solutions—including AVEVA E3D, AVEVA Engineering, Diagrams, Instrumentation, Electrical, Bocad and laser scanning—to create a common information platform and modernize engineering workflows.

With AVEVA’s integrated 3D and data management tools, updates are now communicated automatically, progress is monitored across design and construction, and designs are delivered right‑first‑time. AVEVA helped NIIK cut pipeline specification time from three days to one hour, manage changes 15% faster, resolve clashes 50% faster, produce TX drawings 30% faster and deliver specifications/drawings in one‑third the time, while improving safety, operator confidence and interdepartmental working relationships.


Open case study document...

NIIK

Oleg Kostin

Managing Director


AVEVA

170 Case Studies