Bentley B2B Case Studies & Customer Successes

Bentley logo

Bentley is a global leader dedicated to providing engineers, architects, geospatial professionals, constructors, and owner-operators with comprehensive software solutions for advancing infrastructure. Founded in 1984, Bentley has more than 3,000 colleagues in over 50 countries, more than $600 million in annual revenues, and since 2011 has invested more than $1 billion in research, development, and acquisitions.

Case Studies

Showing 139 Bentley Customer Success Stories

search button

AAEngineering Group reduces design time by 30% and accelerates Kazakhstan gold‑processing plant delivery with Bentley

AAEngineering Group logo

AAEngineering Group achieves USD 2M savings and early commissioning of a seismic-region gold processing plant with Bentley

AAEngineering Group logo

AEGEA achieves 90% sewerage coverage at 58% lower cost with Bentley's SewerGEMS

Aegea logo

AEGEA achieves improved leak detection and asset management with Bentley OpenFlows WaterSight

Aegea logo

Águas do Porto achieves integrated, predictive urban water management with Bentley

Águas do Porto logo

Águas do Porto achieves a real-time digital twin and 25% operational gains with Bentley's water solutions

Águas do Porto logo

Al Ain City Municipality achieves theft‑resistant 5‑cm, 25‑ton gully covers with Bentley (STAAD, OpenFlows, AssetWise)

Al Ain City Municipality logo

Ala Abdulhadi & Khalifa Hawas Consulting Engineering Company achieves rapid city‑scale reality model of Al‑Madinah — saving SAR 42M and modeling 41,672 buildings with Bentley

Ala Abdulhadi & Khalifa Hawas Consulting Engineering Company logo

Alabama Department of Transportation achieves 70% faster animation production and stronger stakeholder buy‑in with Bentley LumenRT

Alabama Department of Transportation logo

ALIGN achieves secure, consistent information control and rapid implementation with Bentley’s BC CDE

ALIGN logo

Amodal achieves unified, 3‑click access to Canada Water project data with Bentley BCDE Portfolio

Amodal logo

Anddes Asociados S.A.C. achieves 10% higher 3D factor of safety with Bentley PLAXIS LE

Anddes Asociados S.A.C. logo

Aqua+ achieves 50% faster control-system design and 70% better documentation quality with Bentley Promis.e

Aqua+ logo

Arab Engineering Bureau achieves up to 30% resource-hour savings and streamlined 3D BIM workflows with Bentley STAAD.Pro

Arab Engineering Bureau logo

Arup delivers Marina Bay Sands resort on time and on budget with Bentley Structural Modeler and GenerativeComponents

Arup logo

Arup Singapore achieves optimized, compliant foundation design for Singapore's tallest tower with Bentley's gINT and PLAXIS

Arup logo

ASGC achieves two-week construction time savings with Bentley's SYNCHRO Pro

ASGC logo

Atkins achieves seamless geotechnical GIS integration and reduced risk with Bentley's OpenGround Cloud

Atkins logo

ATLC Infraconsultants delivers potable water to 300,000 people 25 days early with Bentley's OpenFlows WaterGEMS and STAAD

ATLC Infraconsultants logo

Balfour Beatty achieves ISO 19650‑compliant, standardised information management and enhanced collaboration with Bentley (GroupBC)

Balfour Beatty logo

Bay Area Air Quality Management District achieves block‑level roadway emissions inventory to protect West Oakland health with Bentley (Streetlytics)

Bay Area Air Quality Management District logo

Bridge of Lions achieves historic preservation and modern safety standards with Bentley

Cable Onda achieves streamlined network design and faster outage restoration with Bentley

Cable Onda logo

CADDS Group achieves 30% cost reduction and optimized iron‑ore facility safety with Bentley's ContextCapture & OpenBuildings Designer

CADDS Group logo

Cairn Oil and Gas (Vedanta) boosts well productivity by 10% and saves ~$1.2M/year with Bentley AssetWise

Cairn logo

China National Offshore Oil Corporation (CNOOC) achieves 3D reality mesh and CNY 1M cost savings with Bentley's digital twin solution

China National Offshore Oil Corporation logo

China Railway Engineering Consulting Group Co., Ltd. achieves full-lifecycle BIM benchmark and CNY 3M savings with Bentley

China Railway Engineering Consulting Group Co., Ltd. logo

China Railway Engineering Consulting Group Co., Ltd. achieves CNY 1.8M in construction‑management savings and a 47‑day schedule reduction with Bentley

China Railway Engineering Consulting Group Co., Ltd. logo

Citic Heavy Industries achieves a green, smart cement factory and $2M in equipment maintenance savings with Bentley's collaborative BIM and iTwin Services

Citic Heavy Industries logo

City of Helsinki achieves a citywide digital twin and enhanced citizen engagement with Bentley

City of Helsinki logo

Clark Construction Group achieves safe, precise lift and installation of the world’s longest pedestrian bridge at Sea‑Tac with Bentley SYNCHRO 4D

Clark Construction Group logo

Clark Construction Group achieves accelerated delivery of the $1.4B Chase Center with Bentley's SYNCHRO 4D construction modeling

Clark Construction Group logo

Collins Engineers achieves 20% faster field inspections and streamlined Stone Arch Bridge rehabilitation with Bentley digital twin technology

Collins Engineers logo

Companhia Águas de Joinville secures clean water for 600,000 and saves BRL 4.5M with Bentley OpenFlows WaterGEMS

Companhia Águas de Joinville logo

Cornell University achieves accurate, efficient vendor management with Bentley Procurement Software

Cornell University logo

Danfoss achieves lower maintenance and energy costs with Bentley Amulet

Danfoss logo

Delhi Metro Rail Corporation finalizes 3D alignment design in under three months with Bentley's OpenRail Designer

Delhi Metro Rail Corporation logo

Dockwise halves topsides float-over time and meets record installation schedule with Bentley (MOSES & SACS)

Dockwise logo

DPR Construction achieves tripled Alzheimer’s drug manufacturing capacity and completes project six days early with Bentley SYNCHRO 4D

DPR Construction logo

DRONETEAM.It achieves automated, accurate power-line inspections with Bentley's ContextCapture

DRONETEAM.It logo

DTK Hydronet Solutions achieves 100% 24/7 water supply for 600 Bankura villages with Bentley WaterGEMS

DTK Hydronet Solutions logo

EPCOR Utilities achieves 15% improvement in system reliability with Bentley's AssetWise

Epcor Utilities logo

Foth Infrastructure & Environment achieves an estimated USD 32 million lifecycle savings and accelerated project delivery with Bentley

Foth Infrastructure & Environment logo

Fujian Yongfu Power Engineering achieves typhoon‑ and earthquake‑resistant suction‑pile foundations and 30% cost savings with Bentley’s PLAXIS and OpenWindPower

Fujian Yongfu Power Engineering logo

Genesys International increases tower-inspection accuracy and enables smart inventory management with Bentley’s OpenTower iQ

Genesys International logo

GEOMSA achieves resilient subsea pipeline integrity against geological shifts with Bentley's AutoPIPE

GEOMSA logo

GEOMSA achieves reliable, time- and cost-saving subsea pipeline designs with Bentley AutoPIPE

GEOMSA logo

Golder Associates achieves optimized subsea tunnel design, $16M cost savings and 1,500‑ton CO2 reduction with Bentley

Golder Associates logo

Hatch achieves 100% paperless delivery and six-week schedule cut with Bentley's digital twin

Hatch logo

Hatch achieves on-time, on-budget delivery of a 3,500-meter Lake Ontario tunnel outfall with Bentley

Hatch logo

Hatch Mott MacDonald achieves faster, lower‑risk rail signal design with Bentley Promis.e

Hatch Mott MacDona logo

Highways England reduces lane closures and saves GBP 7 million per year with Bentley’s AssetWise NOMS

Highways England logo

Highways England achieves streamlined project information control and accelerated design approvals with Bentley’s BC platform

Highways England logo

Huadong Engineering Corporation Limited achieves CNY 12 million savings and a full-lifecycle digital twin with Bentley

Huadong Engineering Corporation Limited logo

Hubei Electric Engineering Corporation achieves faster, higher-quality substation design and CNY savings with Bentley

Hubei Electric Engineering Corporation achieves an optimized 80MW solar plant in rugged terrain—saving time and money with Bentley digital twin solutions

i-TEN Associates achieves fast, cost-effective delivery of highly accurate 3D point-cloud models with Bentley MicroStation

i-TEN Associates logo

iForte Solusi Infotek achieves 203% ROI and streamlined lifecycle workflows with Bentley

iForte Solusi Infotek logo

Illinois Department of Transportation achieves 99% automated oversize/overweight permit issuance and faster bridge analysis with Bentley SUPERLOAD

Illinois Department of Transportation logo

Itafos Conda achieves digital asset management and standardized care plans for over 9,000 assets with Bentley AssetWise

Itafos Conda logo

Italferr achieves 5 cm‑precision reality mesh of the Borratino Viaduct with Bentley ContextCapture

Italferr logo

Italferr achieves rapid, clash-free design and delivery of Genoa’s Pergenova Viaduct with Bentley digital twin solutions

Italferr logo

IZZI Telecom expands triple-play to 8 million new customers and reduces design costs 25% with Bentley Communications

izzi Telecom logo

JMC2 Engineering achieves ADA-compliant, pedestrian-friendly Old Torrance revitalization with Bentley

JMC2 logo

John McAslan + Partners achieves transformative King’s Cross station redevelopment with Bentley MicroStation

John McAslan + Partners logo

Johnson Pilton Walker achieves dramatic time and cost savings in designing Australia’s largest sustainable commercial tower with Bentley OpenBuildings Designer

Johnson Pilton Walker logo

Keystone Engineering cuts installation costs 20% and halves design time with Bentley OpenWindPower

Keystone Engineering logo

Khatib & Alami achieves a high‑accuracy Muscat digital twin for security and flood planning with Bentley ContextCapture and LumenRT

Khatib & Alami logo

La Société Wallonne des Eaux achieves 600% faster automated 3D crack detection and €2M savings with Bentley

La Société Wallonne des Eaux logo

Lane Construction Corporation achieves streamlined 4D project management and precise quantity take‑offs for Everglades C-43 reservoir with Bentley

Lane Construction Corporation logo

Leading Vessel and Heat Exchanger Manufacturing Company achieves 20% engineering-hour reduction and 45% drawing-time savings with Bentley's AutoPIPE Vessel

Lebuhraya Borneo Utara achieves digital twins and optimized highway asset performance with Bentley AssetWise

Lebuhraya Borneo Utara logo

Liaoning Water Conservancy and Hydropower Survey and Design Research Institute achieves 95% design-error reduction, CNY 10M savings, and improved water supply to 1.5M residents with Bentley

Liaoning Water Conservancy and Hydropower Survey and Design Research Institute logo

Liaoning Water Conservancy and Hydropower Survey and Design Research Institute achieves 90% fewer design errors and 40% improved efficiency with Bentley OpenRoads Designer and OpenBuildings

Liaoning Water Conservancy and Hydropower Survey and Design Research Institute logo

LLC Volgogradnefteproekt achieves 30% reduction in annual operations costs with Bentley's AssetWise

London Underground Limited achieves 45% peak-capacity increase and major congestion relief with Bentley’s LEGION software

London Underground Limited logo

Los Angeles Department of Water and Power achieves USD 800,000 in annual savings with Bentley’s ProjectWise

Los Angeles Department of Water and Power logo

Louisiana Department of Transportation and Development (LaDOTD) achieves rapid, cost-effective replacement of the I-10 Twin Span Bridge with Bentley

Louisiana Department of Transportation and Development (LaDOTD) logo

Mass Rapid Transit Corporation achieves 35% productivity gain and reduced rework with Bentley's OpenRail BIM Level 2 CDE

Mass Rapid Transit Corporation logo

MCC Capital Engineering & Research Incorporation Ltd. achieves 60% higher power-generation efficiency and major emissions and cost savings with Bentley digital design solutions

MCC Capital Engineering & Research Incorporation Ltd. logo

MCC Capital Engineering & Research Incorporation Ltd. achieves 20% design-time reduction with Bentley OpenPlant

MCC Capital Engineering & Research Incorporation Ltd. logo

MCC Capital Engineering & Research Incorporation Ltd. achieves a green, intelligent digital‑twin steel plant and 50% improved operational efficiency with Bentley

MCC Capital Engineering & Research Incorporation Ltd. logo

Metropolitan District Commission (MDC) achieves first-month ROI and $35,000+ annual savings with Bentley procurement software

Metropolitan District Commission (MDC) logo

MMC Gamuda achieves rapid, accurate reality capture to digitalize Malaysia’s first metro megaproject with Bentley ContextCapture

MMC Gamuda logo

Mott MacDonald achieves 32% faster design production with Bentley's ProjectWise CONNECT Edition

Mott MacDonald logo

Nafta-Gaz achieves 60% faster project delivery and reusable mobile gas-treatment modules with Bentley

Nafta-Gaz logo

Network Rail delivers digital twins and cuts design time 50% with Bentley

Network Rail logo

New York State Department of Transportation achieves industrialized delivery and 15% lower contractor bids for the East 138th Street Bridge with Bentley digital twin solutions

New York State Department of Transportation logo

Oman Gas Company S.A.O.C. achieves 9% improved reliability and fewer equipment failures with Bentley’s AssetWise

Oman Gas Company S.A.O.C. logo

ORCA Offshore achieves reduced steel use and safe, validated installation with Bentley MOSES

ORCA Offshore logo

Oregon Department of Transportation saves USD 6.1 million and improves reporting efficiency 60% with Bentley's AssetWise

Oregon Department of Transportation logo

Osborne achieves streamlined A46 project delivery with Bentley's CDE

Osborne logo

Pacific Gas and Electric Company (PG&E) achieves 50% reduction in 3D modeling costs with Bentley ContextCapture

Pacific Gas and Electric Company logo

Pacific Gas and Electric Company achieves 50% cost reduction in substation modeling with Bentley

Pacific Gas and Electric Company logo

Pacific Gas and Electric Company achieves faster, safer brownfield substation construction and $350,000–$400,000 savings with Bentley (Substation, ContextCapture, SYNCHRO)

Pacific Gas and Electric Company logo

PDC Consultants cuts 2D review drawing production by 50% and completes deliverables four months early with Bentley ProSteel

PDC Consultants logo

Pestech International Berhad achieves 50% faster design and 60% fewer revisions to digitalize a 230-kV substation and power 11 villages with Bentley

Pestech International Berhad logo

Pestech International Berhad achieves 50% faster design and MYR 200,000 savings with Bentley Substation

Pestech International Berhad logo

PLP Architecture achieves rapid, low‑risk roof design and planning approval with Bentley GenerativeComponents

PLP Architecture logo

Precision Valley Communications achieves 80% reduction in HFC design time with Bentley software

Precision Valley Communications logo

PT MRT Jakarta achieves sustainable, faster MRT delivery and 10% working-time savings with Bentley's connected data environment

PT MRT Jakarta logo

PT. Wijaya Karya (Persero) Tbk delivers 300‑bed COVID‑19 hospital and accelerates operations by 2 months with Bentley

PT. Wijaya Karya (Persero) Tbk logo

PT. Wijaya Karya (Persero) Tbk achieves faster, cost-saving design of the world’s longest double-decker bridge with Bentley

PT. Wijaya Karya (Persero) Tbk logo

RISE Structural Design achieves 10× faster coupling analysis and reduced design costs with Bentley AutoPIPE & STAAD

RISE Structural Design logo

SAIDEL Engineering achieves subway-operator approval and halves tunnel impact for Bucharest’s first residential building above subway tunnels with Bentley PLAXIS

SAIDEL Engineering logo

Sainsbury's achieves a unified cloud-based digital estate and faster, more confident asset decisions with Bentley's BC (One Property) solution

Sainsbury's logo

Shenyang Aluminum & Magnesium Engineering & Research Institute (SAMI) achieves a digital-twin foundation for smart factories and CNY 117M in savings with Bentley

SAMI logo

SATRIA Technologies achieves 50% faster design and MYR 20,000 savings with Bentley Promis.e

SATRIA Technologies logo

Shanghai Water Engineering Design and Research Institute Co., Ltd. achieves 25% improved collaborative efficiency and saves three months with Bentley

Shanghai Water Engineering Design and Research Institute Co., Ltd. achieves 3-month early delivery and CNY 50M savings on a 300 MW offshore wind farm with Bentley

Sichuan Road and Bridge Group achieves CNY 17.5M cost savings and 124‑day schedule reduction with Bentley

Sichuan Road and Bridge Group logo

Skanska Costain STRABAG JV achieves major cost and time savings with Bentley's connected BIM solutions

Skanska Costain STRABAG JV logo

SMRT Trains achieves 1 million MKBF and reduces planning hours with Bentley AssetWise

SMRT Trains logo

Sofia Municipality achieves optimized street lighting, reduced operational costs, and improved customer service with Bentley OpenUtilities

Soyuzhimpromproekt reduces design time by 25% for Russia’s first methylchlorosilane plant with Bentley’s interoperable BIM solutions

Sterlite Power Transmission Limited achieves faster, cost‑saving delivery of remote renewable power infrastructure with Bentley

Sterlite Power Transmission Limited logo

Sweco Nederland achieves 25% reduction in construction error resolution costs with Bentley’s iTwin Design Review

Sweco logo

Sweco achieves 10% project efficiency savings across global projects with Bentley's ProjectWise

Sweco logo

SYSTRA achieves optimized passenger flow and lower energy costs at Gare du Nord with Bentley LEGION

SYSTRA logo

Tantek 4D achieves streamlined construction planning and boosted productivity with Bentley SYNCHRO 4D

Tantek 4D logo

Thames Water achieves trusted, centralized project and asset information across its £1bn capital investment programme with Bentley

Thames Water logo

Tideway achieves 90-day programme reduction and £1M savings with Bentley SYNCHRO 4D

Tideway logo

Tierra Group achieves 3D resolution of complex slope stability at tailings dam corner with Bentley (PLAXIS LE & PLAXIS Designer)

Tierra Group logo

Tower Engineering Professionals, Inc. achieves up to 60% time savings and streamlined tower-analysis workflows with Bentley OpenTower

Tower Engineering Professionals, Inc. logo

Toyo Engineering achieves 30% faster engineering and sets new Malaysian concrete standards with Bentley's STAAD Advanced Concrete Design

Toyo Engineering logo

TRC (engineering firm) eliminates construction delays and cost overruns with Bentley Substation

TRC logo

TYPSA Group achieves ISO 19650 certification and streamlined global BIM workflows with Bentley ProjectWise

Typsa Group logo

University of Birmingham secures unified control of GBP 1B redevelopment data and cuts handover to 1 month with Bentley's BCDE

University of Birmingham logo

Voyants Solutions achieves a 50% increase in ROI and industrializes project delivery with Bentley

Voyants Solutions logo

VYOM Consultants achieves rapid, cost-efficient, column-free office design with Bentley STAAD

PT. Waskita Karya achieves faster, cost‑efficient Manggarai Station revitalization with Bentley digital twin solutions

Waskita Karya logo

West Virginia Department of Transportation achieves real-time automated oversize/overweight permitting and enhanced bridge safety with Bentley SUPERLOAD and LARS Bridge

West Virginia Department of Transportation logo

Western Cape Government achieves integrated travel, freight, and land‑use modeling for performance‑based transport planning with Bentley CUBE

Western Cape Government logo

WISDRI Engineering & Research Incorporation Limited achieves 30% design-efficiency gain and 105-day schedule reduction with Bentley

WISDRI Engineering & Research Incorporation Limited logo

WSB achieves $12M+ cost savings and accelerated TH 169 freeway conversion with Bentley digital workflows

WSB logo

WSP achieves nearly 40% faster structural modeling and major cost savings for 22 Bishopsgate with Bentley (RAM Structural System & RAM Concept)

WSP logo

WSP achieves optimized, cost‑effective structural design for One Blackfriars with Bentley (MicroStation & RAM)

WSP logo

WSP builds 50-story Principal Tower on a tiny footprint while protecting Victorian-era rail tunnels with Bentley (PLAXIS and RAM Concept)

WSP logo

Zakum Development Company reinstates ship‑impacted wellhead platform and saves USD 2.6M with Bentley SACS

Zakum Development Company logo

No matching case studies