Case Study: Pestech International Berhad achieves 50% faster design and MYR 200,000 savings with Bentley Substation

A Bentley Case Study

Preview of the Pestech International Berhad Case Study

Pestech International Improves Design Time by 50% and Saves MYR 200,000 on Substation Expansion

Pestech International Berhad, a substation and transmission-line EPC contractor, was awarded an RM 79.5 million contract by Tenaga Nasional Berhad to expand the Olak Lempit substation in Banting. Constrained by tight timelines, site access issues, coordination with another main contractor, and the limitations of traditional CAD-centric workflows, Pestech turned to Bentley to implement a 3D modeling and reality-capture approach.

Bentley deployed a suite of solutions—centered on Bentley Substation and including OpenBuildings Designer, Bentley Raceway and Cable Management, ContextCapture, Navigator, Promis.e, and ProjectWise—to create a to-scale 3D reality mesh, intelligent equipment libraries, and an interoperable iModel for clash detection and automated reporting. The Bentley-based workflow cut design time by 50% (construction drawings took 1 day vs. 10), reduced cable waste by 10–20%, improved collaboration and approvals, and saved an estimated MYR 200,000.


Open case study document...

Pestech International Berhad

Sean Lee

Assistant Manager


Bentley

139 Case Studies