Italferr S.p.A., part of the Italian State Railways Group, was commissioned to rapidly design an emergency replacement for the collapsed Morandi Bridge in Genoa — a EUR 202 million Pergenova Viaduct project that demanded a complete design in just three months while construction began. To meet tight safety, footprint, and multidisciplinary coordination requirements, Italferr turned to Bentley and its BIM/digital twin toolset, using Bentley applications such as MicroStation, OpenRoads, OpenBuildings Designer, ProjectWise, SYNCHRO, Descartes, Navigator, and LumenRT.
Using Bentley’s digital twin and BIM methodology, Italferr created a unified 3D model that federated 34 separate discipline models, automated workflows with SYNCHRO 4D scripts, and used ProjectWise for a single source of truth and Navigator for clash detection. The Bentley-enabled solution let the team complete the design on schedule, reduce clashes and rework, accelerate decision-making and cost forecasting, and streamline construction planning — preserving the project timeline and restoring a vital transport link for Genoa.
Daniela Aprea
BIM Manager