Case Study: MCC Capital Engineering & Research Incorporation Ltd. achieves a green, intelligent digital‑twin steel plant and 50% improved operational efficiency with Bentley

A Bentley Case Study

Preview of the MCC Capital Engineering & Research Incorporation Ltd. Case Study

MCC Capital Engineering & Research Delivers Green, Smart Manufacturing Facility

MCC Capital Engineering & Research Incorporation Ltd. led design and construction of a USD 6 billion, 7‑million‑ton annual iron and steel plant in Tangshan that spanned 534 hectares and 42 plants. Faced with highly complex, multidisciplinary systems, dispersed teams, tight schedules, and the need to deliver a synchronized digital factory, MCC turned to Bentley’s digital twin and BIM solutions to overcome coordination, collision‑avoidance, and data‑management challenges.

Bentley delivered a connected data environment using ProjectWise, ContextCapture, SYNCHRO 4D, and AssetWise ALIM to create a unified digital twin that synchronized design, construction, and operations. As a result, MCC shortened the design cycle by 35 days, cut the construction cycle by 75%, avoided USD 6 million in material waste, improved operational efficiency by 50%, and reduced spare‑parts quantities by 40%, while enabling real‑time monitoring, simulation, and smarter energy‑efficient operations.


Open case study document...