PlanGrid Build B2B Case Studies & Customer Successes

PlanGrid Build logo

PlanGrid builds simple, powerful software construction teams love to use. The company’s mobile-first technology gives general contractors, subs, owners and architects access to information in real-time, enables greater collaboration and provides actionable insights. With PlanGrid, any construction team member can manage and update blueprints, specs, photos, RFIs, field reports, punchlists and other information from any device. PlanGrid is used on 1.5 million projects across commercial, heavy civil and other industries in 100+ countries. With over 150 million digital blueprints on its cloud-based platform, PlanGrid is also the largest digital blueprint repository in the world. PlanGrid was founded in 2011 and is headquartered in San Francisco. The company was acquired by Autodesk in 2018.

Case Studies

Showing 92 PlanGrid Build Customer Success Stories

search button

AbraxysGlobal achieves 90% paperless operations and faster compliance with PlanGrid Build

AbraxysGlobal logo

AECOM achieves reduced project time and cost with PlanGrid Build

AECOM logo

Air Analysis of Atlanta achieves $15,000 labor savings and 10–20% faster project delivery with PlanGrid Build

Air Analysis of Atlanta logo

Allied Builders System achieves predictable pricing and streamlined project management with PlanGrid Build

Allied Builders System logo

Ardent Construction achieves $62,000 in savings and an 8,192% ROI with PlanGrid Build

Ardent Construction logo

Baptist Health achieves streamlined field collaboration and faster project delivery with PlanGrid Build

Baptist Health logo

Bartlett Cocke General Contractors achieves significant time, paper and rework savings with PlanGrid Build

Bartlett Cocke General Contractors logo

Barton Malow achieves Lean construction collaboration and single-source data transparency with PlanGrid Build

Barton Malow logo

BN Electrical achieves 12% faster project delivery with PlanGrid Build

BN Electrical logo

BNBuilders achieves faster punch-list completion and improved field collaboration with PlanGrid Build

BNBuilders logo

Brasfield & Gorrie achieves integrated quality management and faster field collaboration on a 1M sq ft hospital with PlanGrid Build

Brasfield & Gorrie logo

Brinkman Construction achieves 50% reduction in project closeout labor with PlanGrid Build

Brinkman Construction logo

BSA | Allstaff achieves standardised construction collaboration and faster, safer material tracking with PlanGrid Build

BSA | Allstaff logo

CBG Building Company cuts two weeks per project and halves printing costs with PlanGrid Build

CBG Building Company logo

How This Atlanta Fast-Food Giant Builds Better with Data

Chick-fil-A logo

China Harbour Engineering Company achieves 70% efficiency gains with PlanGrid Build

China Harbour Engineering Company logo

The Christman Company achieves improved productivity and real-time collaboration with PlanGrid Build

Christman Company logo

Clayco achieves zero end-of-phase punchlists and 50% fewer issues with PlanGrid Build

Clayco logo

Collaborative Structures Limited achieves on-time delivery and improved jobsite efficiency with PlanGrid Build

Collaborative Structures Limited logo

Comcast Technology Center saves 15 hours/week and accelerates construction with PlanGrid Build

Comcast Technology logo

Complete Millwork Services wins more business by streamlining bid management with PlanGrid Build

Complete Millwork Services logo

CoveKinloch (New Zealand building consultancy) achieves 40% faster project delivery and 60% higher profit margins with PlanGrid Build

CoveKinloch logo

CRB achieves waste reduction and faster timelines with PlanGrid Build

CRB logo

CRB reduces coordination time by 60% with PlanGrid Build

CRB logo

Crossland Construction achieves streamlined project coordination and faster plan updates with PlanGrid Build

Crossland Construction logo

Cupertino Electric, Inc. achieves streamlined field operations and greater accuracy with PlanGrid Build

Cupertino Electric, Inc. logo

Davenport Masonry achieves faster drawing updates and major time savings with PlanGrid Build

Davenport Masonry logo

DPR Construction achieves faster field coordination and issue resolution with PlanGrid Build

DPR Construction logo

Fortis Group achieves faster field-to-office communication and stronger client relationships with PlanGrid Build

Fortis Group logo

Gamuda achieves 88% productivity boost with PlanGrid Build

Gamuda logo

Gephart Electric achieves paperless, faster field workflows with PlanGrid Build

Gephart Electric logo

Glenveagh Properties achieves faster, compliant project closeouts and saves time and money with PlanGrid Build

Glenveagh Properties logo

Granger Construction slashes field costs and eliminates printing labor with PlanGrid Build

Granger Construction logo

Granite Construction achieves centralized project communication and faster approvals with PlanGrid Build

Granite Construction logo

Granite Construction achieves reduced rework and boosted field productivity with PlanGrid Build

Granite Construction logo

Hoar Construction achieves $1M+ in savings and major rework reduction with PlanGrid Build

Hoar Construction logo

Innovative Mechanical achieves streamlined bid tracking and saves a full workday per week with PlanGrid Build

Innovative Mechanical logo

Interserve achieves a 9-day NEC Nightingale build and seamless field collaboration with PlanGrid Build

Interserve logo

ISEC, Inc achieves better field-to-office connectivity and faster project delivery with PlanGrid Build

ISEC, Inc logo

J. Calnan & Associates achieves 4x faster PCO processing and 50% reduced admin time with PlanGrid Build

J. Calnan & Associates logo

Jerram Falkus Group achieves on-time, on-budget delivery and improved productivity with PlanGrid Build

Jerram Falkus Group logo

Joeris General Contractors achieves 5–7 hours/week field-time savings and 30–40% faster punchlist completion with PlanGrid Build

Joeris General Contractors logo

John E. Green Company achieves streamlined quality management and drawing/document control with PlanGrid Build

John E. Green Company logo

How a Simplified Tech Stack Improved Efficiency at John Holland Group by 15%

John Holland Group logo

JP Cullen & Sons achieves faster punchlists and six-figure cost savings with PlanGrid Build

JP Cullen & Sons logo

KRT Building Consultants achieves streamlined QA, faster issue resolution, and cost savings with PlanGrid Build

KRT Building Consultants logo

LPR Construction achieves faster field coordination and nearly $2M annual savings with PlanGrid Build

LPR Construction logo

Mark III Construction achieves reduced waste and increased productivity with PlanGrid Build

Mark III Construction logo

Marx|Okubo Associates, Inc achieves on-the-same-page collaboration and productivity gains with PlanGrid Build

Marx|Okubo Associates, Inc logo

McGregor Industries Inc. achieves faster, safer stair installations and real-time field collaboration with PlanGrid Build

McGregor Industries Inc. logo

McKinstry achieves 50% time-savings in Earned Value Tracking with PlanGrid Build

McKinstry logo

Nan Inc achieves increased field productivity and avoids costly rework with PlanGrid Build

Nan Inc logo

NEA Baptist Hospital achieves 77x ROI and $796K annual savings with PlanGrid Build

NEA Baptist Hospital logo

NVIDIA achieves real-time collaboration and seamless document control with PlanGrid Build

Nvidia logo

O’Mahony Pike achieves faster inspections and accelerated closeouts with PlanGrid Build

O’Mahony Pike logo

Overaa Construction achieves faster coordination and streamlined inspections on healthcare projects with PlanGrid Build

Overaa Construction logo

Permasteelisa Group - Customer Case Study

Permasteelisa Group logo

Plant Construction achieves paperless, streamlined workflows and stronger team collaboration with PlanGrid Build

Plant Construction logo

Pond and Company achieves 50% more bids and rapid industrial project scaling with PlanGrid Build

Pond and Company logo

Power Design achieves $6.7M/year in savings with PlanGrid Build

Power Design logo

Prism Electric achieves real-time BIM-field coordination and major time savings with PlanGrid Build

Prism Electric logo

Pro-Craft Construction achieves real-time field collaboration and operational efficiency with PlanGrid Build

Pro-Craft Construction logo

Pure Construction Management achieves on-time, under-budget projects with PlanGrid Build

Pure Construction Management logo

The Raymond Group achieves 90% impact-cost recovery, 60 weekly hours saved and 100% paper elimination with PlanGrid Build

Raymond Group logo

Related Companies - Customer Case Study

Related Companies logo

Rider Levett Bucknall achieves real-time cost control and increased productivity with PlanGrid Build

Rider Levett Bucknall logo

Righetti Partner Group achieves streamlined collaboration and reduced rework with PlanGrid Build

Righetti Partner Group logo

Rosendin Electric achieves standardized quality and reduced rework with PlanGrid Build

Rosendin Electric logo

SAM Drylining cuts revenue losses and boosts field productivity with PlanGrid Build

SAM Drylining logo

Shive-Hattery - Customer Case Study

Shive-Hattery logo

Shopify scales multidisciplinary construction teams for rapid global growth with PlanGrid Build

Shopify logo

Skanska cuts construction time by 25% and reduces costs by 20% with PlanGrid Build

Skanska logo

Snyder Langston achieves real-time field collaboration and reduced rework with PlanGrid Build

Snyder Langston logo

Sobha Group achieves improved site collaboration and productivity with PlanGrid Build

Sobha Group logo

Sorella Group achieves faster field coordination and saves a week of communication with PlanGrid Build

Sorella Group logo

Stowe Australia achieves company-wide data centralisation and time savings with PlanGrid Build

Stowe Australia logo

Straits Construction achieves a 20% reduction in major reworks with PlanGrid Build

Straits Construction logo

Sundt Construction achieves real-time field collaboration and unified plans with PlanGrid Build

Sundt Construction logo

T.B. Penick & Sons achieves $104K in savings and 1,251 hours saved with PlanGrid Build

T.B. Penick & Sons logo

TEECOM achieves $440,000 in savings and 9,067% ROI with PlanGrid Build

TEECOM logo

Teichert Construction achieves faster jobsite communication and over $200,000/year labor savings with PlanGrid Build

Teichert Construction logo

PENTA Building Group Places Its Bet on Construction Technology for Operational Certainty in Las Vegas

The Penta Building Group logo

The PENTA Building Group achieves faster project delivery and improved field collaboration with PlanGrid Build

The Penta Building Group logo

The PENTA Building Group achieves record-fast delivery of a 3.8-mile Las Vegas F1 racetrack in 11.5 months with PlanGrid Build

The Penta Building Group logo

The Walsh Group achieves faster, higher-quality streetcar delivery with PlanGrid Build

The Walsh Group logo

Trussway Manufacturing achieves real-time, company-wide remote design collaboration with PlanGrid Build

Trussway Manufacturing logo

VAICO achieves 92% faster report turnaround and major time and cost savings with PlanGrid Build

VAICO logo

VEC, Inc. achieves streamlined documentation and faster project turnover with PlanGrid Build

VEC, Inc. logo

Voyage Care reduces project delays and boosts collaboration with PlanGrid Build

Voyage Care logo

W.E. O’Neil Construction - Customer Case Study

W.E. O’Neil Construction logo

Walker Engineering achieves streamlined field-office collaboration and faster installations with PlanGrid Build

Walker Engineering logo

Whitman, Requardt & Associates achieves faster job close-outs and saves time with PlanGrid Build

Whitman, Requardt & Associates logo

No matching case studies