PlanGrid Build
92 Case Studies
A PlanGrid Build Case Study
Pure Construction Management (PCM) is a Sydney-based builder of high-end, architecturally designed homes that was struggling with inefficient document workflows. Teams relied on Dropbox and manual PDF uploads, and a prior all‑in‑one app failed to gain field adoption, causing redundancies, costly rework and schedule risk.
PCM switched to PlanGrid for its ease of use and integration with their Jonas Premier project/accounting system. After a successful pilot, the whole company adopted PlanGrid as a single source of truth—enabling real‑time drawings, defect tracking, fewer prints and smoother handoffs—resulting in better schedule adherence, reduced rework and estimated project savings of 10–15%.
Ryan Shepherd
Director of Construction