Case Study: Air Analysis of Atlanta achieves $15,000 labor savings and 10–20% faster project delivery with PlanGrid Build

A PlanGrid Build Case Study

Preview of the Air Analysis of Atlanta Case Study

Air Analysis of Atlanta - Customer Case Study

Air Analysis of Atlanta Inc. (AAI), a third‑party commissioning and TAB firm, used PlanGrid on the University of Georgia Correll Hall (BLC Phase I) project to address complex mechanical systems and strict university verification requirements. The building’s three fan‑array AHUs manifolded on supply/return/outside air and campus‑loop chilled/hot water made field documentation difficult, and AAI’s prior workflow relied on time‑consuming manual photos and post‑site reporting.

By implementing PlanGrid during construction, AAI linked photos directly to plan locations, generated reports in minutes, and conducted inspections hands‑free from a mobile device. The team saved an estimated 150 onsite hours (about $15,000 in billable labor), cut projected project time by 10–20%, and achieved a reported ROI of 7,400%.


Open case study document...

Air Analysis of Atlanta

Dane Richards

Cx & Business Operations Manager


PlanGrid Build

92 Case Studies