PlanGrid Build
92 Case Studies
A PlanGrid Build Case Study
Power Design Inc., one of the largest electrical subcontractors in the U.S. specializing in multi‑family projects, faced major plan-management challenges: paper-heavy workflows, slow and error-prone plan uploads, frequent versioning issues, and poor office-field collaboration. A Mobile Subcommittee identified the need for easier access to current drawings, faster uploading and better collaboration, and after extensive vetting they selected a mobile solution to address these gaps.
They piloted PlanGrid on a 461‑unit project, went paperless and issued iPads to field leaders; the app’s real‑time sync, simple drag‑and‑drop uploads, offline mobile access, annotations and photo-based issue tracking solved their core problems. Power Design reported average savings of 8 hours per person per week, $4.3M in annual productivity gains, $2.4M in rework savings and $600K in paper savings, yielding roughly $6.7M net yearly benefit and scaling to 900+ users across 950+ projects.
Jenny Schnackenberg
Project Executive