Case Study: China Harbour Engineering Company achieves 70% efficiency gains with PlanGrid Build

A PlanGrid Build Case Study

Preview of the China Harbour Engineering Company Case Study

China Harbour improves efficiency by 70% with Autodesk Construction Cloud

China Harbour Engineering Company Ltd’s Singapore branch is delivering 8 Shenton Way, a 305 m “supertall” mixed‑use tower, on a design‑build contract that requires tight coordination among designers, engineers, consultants, contractors and the client. The challenge was to manage large design and construction data from a single source of truth so site teams always had access to the latest drawings and coordinated models without time‑consuming file exchanges.

China Harbour implemented Autodesk Construction Cloud (with Revit integration) to provide real‑time shared models, streamlined clash detection and automated document workflows. The cloud platform reduced manual model consolidation and sped BIM data exchange (improving BIM workflow efficiency by more than 70%), cut clash‑detection efforts (saving about 6–8 hours/month), and boosted RFI/RFA processing by ~20–30%, enabling faster, more confident stakeholder decisions throughout the project.


Open case study document...

China Harbour Engineering Company

Allen Datu

Corporate BIM Manager


PlanGrid Build

92 Case Studies