Case Study: BN Electrical achieves 12% faster project delivery with PlanGrid Build

A PlanGrid Build Case Study

Preview of the BN Electrical Case Study

How Digitising Construction Management Helped BN Electrical Deliver a Project 12% Ahead of Schedule

BN Electrical is a commercial electrical contractor in Australia specialising in healthcare, science and education facilities. Facing tighter budgets, compressed programs and rising expectations for quality, the firm decided to go fully paperless to improve document management, field collaboration and reduce project risk.

They rolled out tablets with PlanGrid (Autodesk Construction Cloud), moved all drawings, mark-ups and tasks into the cloud, and embedded schedules and photos directly on plans. The digital workflow captured and managed 100+ changes on the complex Capitol Theatre job, cut printing costs (about $800/month), eliminated rework and improved quality control—completing the project 12% under allocated budgeted hours with greater transparency and productivity.


Open case study document...

BN Electrical

Matthew Bien-Izowski

Managing Director


PlanGrid Build

92 Case Studies