PlanGrid Build
92 Case Studies
A PlanGrid Build Case Study
AbraxysGlobal Health & Safety Consultants provides NEBOSH-qualified floor managers and stand-plan checking for exhibitions worldwide, helping organisers, venues and local authorities enforce build and safety regulations. The company relied on paper A1 plans and handwritten incident forms across shows with up to 2,000 stands and a 20+ person onsite team, and earlier attempts at shared PDFs were hampered by unreliable venue internet, duplication of work and slow reporting.
In January 2018 AbraxysGlobal rolled out PlanGrid, uploading stand plans, technical floorplans and event regulations to team devices so staff had offline access, tagged locations and could file date‑stamped reports with photos in real time. The solution is now used at shows in over 20 countries, driving roughly 90% paper reduction, faster post‑show reporting, improved remote monitoring and productivity, easier contractor access control for GDPR, and fewer accidental data losses.
Kane Simpson
Brand Manager