Trimble MEP B2B Case Studies & Customer Successes

Trimble MEP logo

With the ever-changing demands placed on MEP contractors to do more with less, few solution providers today have the suite of technology solutions that span the needs of the office to the field---all while helping to lower risk and allowing the contractor the ability to maintain profit margins. Trimble's expertise in positioning technologies for mobile workforce productivity, combined with key domain knowledge in the sub-trades, enables the MEP Division to meet the large and small MEP customers need.

Case Studies

Showing 41 Trimble MEP Customer Success Stories

search button

ACP Sheet Metal achieves faster shop production and reduced material waste with Trimble MEP

ACP Sheet Metal logo

Arden Engineering Constructors achieves almost 90% field labor savings and faster, more accurate as-built HVAC data with Trimble MEP

Arden Engineering Constructors logo

Arup - Customer Case Study

Arup logo

Bright Sheet Metal cuts modeling time from weeks to days and improves trade coordination with Trimble MEP (SysQue)

Bright Sheet Metal logo

Brown & Read Engineering achieves 4x faster, more accurate bids with Trimble MEP

Brown & Read Engineering logo

Brown University achieves real-time BIM coordination and accelerated prefabrication with Trimble MEP

Brown University logo

Cache Valley Electric achieves 50% faster installation times with Trimble MEP

Cache Valley Electric logo

Caleffi Hydronic Solutions guides customers to the right technical choices with MEPcontent

Caleffi logo

Caleffi Hydronic Solutions guides customers to the right technical choices with MEPcontent

Canem Systems achieves uninterrupted estimating and faster bids with Trimble MEP's Accubid Anywhere

Canem logo

Cochran achieves 20–30% faster digital takeoffs and 50–60% faster drawing checks with Trimble MEP's Accubid LiveCount

Cochran logo

Continental Electrical Construction Company achieves faster, more confident estimating with Trimble MEP

Continental Electrical Construction Company logo

Cooper Electrical Construction Company Sets The Standard For Prefabrication Accuracy and Efficiency with Trimble SysQue

Cooper Electrical Construction Company logo

COSCO Fire Protection achieves precise, faster robotic layout for complex fire‑protection installs with Trimble MEP

COSCO Fire Protection logo

EC Electric achieves 90% labor savings with Trimble MEP's TX6 3D Scanner and RealWorks

EC Electric logo

ELCO achieves expanded BIM offerings and streamlined design workflows with Trimble MEP

ELCO logo

F.E. Moran achieves seamless BIM-to-field coordination and 10x field productivity with Trimble MEP

F.E. Moran logo

G. M. McCrossin Inc. achieves 100% off-site prefabrication and faster, lower-cost installation with Trimble MEP

G. M. McCrossin Inc. logo

Gaylor Electric achieves faster, more accurate estimating and remote access with Trimble MEP (Accubid Anywhere)

Gaylor Electric logo

Hewlett-Packard achieves streamlined 3D BIM coordination and fabrication for complex underground piping with Trimble MEP

Hewlett-Packard logo

J.M. Brennan achieves 15% cost savings and 90% prefabrication with Trimble MEP (SysQue)

J.M. Brennan logo

Jamerson & Bauwens Electrical achieves 2-3x faster, more accurate estimating and completes a winning hospital bid in 5 days with Trimble MEP (Accubid Anywhere)

Jamerson & Bauwens Electrical logo

Ken Neyer Plumbing, Inc. achieves 1/16-inch accuracy and faster post-tension slab layout with Trimble MEP

Ken Neyer Plumbing, Inc. logo

Leach & Russell Mechanical achieves high-quality designs faster with complete accuracy with Trimble MEP

Leach & Russell Mechanical logo

Megens Installations achieves rapid, accurate BIM-to-site layout with Trimble MEP

Megens Installations logo

MTech Inc achieves streamlined BIM coordination and faster, more accurate fabrication with Trimble MEP

MTech Inc logo

Myco Mechanical achieves 15–30% labor savings and faster, more accurate fabrication with Trimble MEP (SysQue, Robotic Total Stations & X7)

Myco Mechanical logo

NIBCO achieves increased product specification and reach with Trimble MEP

NIBCO logo

NIBE Energietechniek BV achieves wider BIM adoption and faster deployment of sustainable, connected heat pumps with Trimble MEP

NIBE Energietechniek BV logo

North Mechanical Contracting & Service cuts $1M in shared project costs with Trimble MEP (Trimble SysQue)

North Mechanical Contracting & Service logo

Price Electric accelerates university center construction with fast spooling and prefabrication using Trimble MEP (SysQue)

Price Electric logo

Prout Boiler Heating & Weld Inc. achieves fast-track project delivery through multi-trade prefabrication and 3D BIM coordination with Trimble MEP

Prout Boiler Heating & Weld Inc. logo

Pure Mechanical Group achieves faster, more accurate estimates and more winning bids with Trimble MEP

Pure Mechanical Group logo

How Renick Brothers Accelerates Project Delivery Using SysQue Intelligence

Renick Brothers logo

SANHA Group achieves faster BIM design, improved coordination and sustainability with Trimble MEP

SANHA Group logo

SB mechanical achieves 10 percent cost savings for HVAC ductwork with increased field labor, efficiency and less waste with Trimble SysQue

SB Mechanical logo

Shane Mechanical - Customer Case Study

Shane Mechanical logo

Shoffner Kalthoff MES, Inc. achieves reduced field labor hours and increased productivity with Trimble MEP

Shoffner Kalthoff MES, Inc. logo

Straus Systems Inc achieves 4x faster hanger layout and 1/16-inch accuracy with Trimble MEP

Straus Systems Inc logo

Triple M LocalWorks achieves 100% install accuracy and rapid high‑rise hanger layout with Trimble MEP

Triple M LocalWorks logo

Volunteer Energy Cooperative achieves faster, more accurate underground conduit layout with Trimble MEP

Volunteer Energy Cooperative logo

No matching case studies