Lectra B2B Case Studies & Customer Successes

Lectra logo

Lectra is the world leader in integrated technology solutions software, automated cutting equipment, and associated services specifically designed for industries using fabrics, leather, technical textiles, and composite materials to manufacture the products. It serves major world markets (fashion and apparel, automotive, and furniture) as well as a broad array of other industries.

Case Studies

Showing 60 Lectra Customer Success Stories

search button

Art Stone achieves 20% higher throughput and 10–15% fabric savings with Lectra's Optiplan cutting-room solutions

Art Stone logo

ASTRO Apparel maintains ISO standards and cuts marker-making cycle time nearly 20% with Lectra

Astro logo

B&B Italia achieves 30% productivity increase and 3% hide reduction with Lectra’s Versalis offline process

B&B Italia logo

Baroque Japan achieves 10% efficiency gain and 1-month faster time-to-market with Lectra Fashion PLM

Baroque logo

BOS Automotive - Customer Case Study

BOS Automotive logo

Cordeiro Campos achieves improved productivity and profitability with Lectra's 3D technology

Cordeiro Campos logo

Corse Composites achieves maximum productivity and material savings with Lectra's composite CAD/CAM solutions

Corse Composites logo

Dani Automotive reduces costs and minimizes downtime with Lectra's Versalis automated cutting solution

Dani Automotive logo

Dassault Falcon Jet achieves faster turnaround and improved interior quality with Lectra

Dassault Falcon Jet logo

Désirée Furniture achieves faster, cost-saving design while preserving artisanship with Lectra’s DesignConcept 3D

Désirée Furniture logo

DFM achieves 5% reduction in hide consumption and increased production capacity with Lectra’s Versalis

DFM logo

Durlet boosts production and cuts material use by 10% while preserving craftsmanship with Lectra

Durlet logo

Duvivier Productions achieves double leather-cutting capacity while preserving traditional craftsmanship with Lectra's Versalis solution

Duvivier Productions logo

ECA achieves up to 80% hide efficiency with Lectra’s Versalis zero-buffer cutting

ECA logo

Ekornes ASA achieves 5–6% leather savings and increased productivity with Lectra's Versalis

Ekornes ASA logo

Ese.Y achieves agile, high-quality, cost-saving production with Lectra Vector

F&F achieves right-first-time fit with Lectra’s 3D virtual prototyping (Modaris 3D)

F&F logo

Façonnable achieves streamlined product development and improved quality with Lectra Fashion PLM

Faconnable logo

GGZ accelerates product development and expands internationally with Lectra Modaris Expert

GGZ logo

GKN Aerospace achieves increased productivity and reduced material waste with Lectra

GKN Aerospace logo

Global Safety Textiles achieves tripled production capacity and reduced cost per airbag with Lectra's FocusQuantum

Global Safety Textiles logo

Godfrey Syrett achieves 70% capacity increase and £150K annual fabric savings with Lectra

Godfrey Syrett logo

Gruppo Mastrotto improves leather yield and production flexibility with Lectra’s Versalis

Gruppo Mastrotto logo

Guangzan achieves 50%+ productivity increase and leaner operations with Lectra's Vector cutting solution

Guangzan logo

Haber’s achieves faster turnaround and higher-quality production with Lectra

Haber’s logo

HMT New Technical Materials increases airbag capacity 2–3× and cuts costs with Lectra's FocusQuantum

HMT logo

Imperial Fashion achieves 7-day design-to-sales turnaround with Lectra Fashion PLM

Imperial Fashion logo

J. C. Penney achieves faster design decisions and color consistency with Lectra Kaledo

J. C. Penney logo

Jack Victor preserves Made-in-Canada manufacturing and boosts efficiency with Lectra

Jack Victor logo

Johnson Controls achieves 95% first-prototype success and dramatically faster small‑parts development with Lectra’s DesignConcept Auto

Johnson Controls logo

Johnson Controls achieves production flexibility and reduced fabric costs with Lectra's Vector cutting solutions

Johnson Controls logo

Katzkin achieves doubled throughput and eliminates cutting bottlenecks with Lectra

Katzkin logo

Kauno Baltija achieves perfect fit and faster time-to-market with Lectra's 3D virtual prototyping

Kauno Baltija logo

Kuka Home achieves improved quality, optimized leather use and higher manufacturing efficiency with Lectra (DesignConcept & Versalis)

Kuka Home logo

Kurabo International achieves 20% reduction in manpower and 10%+ productivity gains with Lectra

Kurabo International logo

La Moda achieves 30% production boost and 2% fabric savings with Lectra

La moda logo

Shanghai childrenswear brand Les Enphants speeds collection planning and reduces costs with Lectra Fashion PLM (Lectra)

Les Enphants logo

Lise Charmel achieves efficient, accurate cost control with Lectra technology

Lise Charmel logo

Maggy London achieves precise engineered-print placement and material savings with Lectra

Maggy London logo

Mario Levi achieves up to 20% higher productivity and 4% better hide yield with Lectra's Versalis automated cutting

Mario Levi logo

Maxwell Industries achieves automation, 5% fabric savings and improved quality with Lectra

Maxwell Industries logo

Miti achieves control of leather cutting and maximizes material efficiency with Lectra’s Versalis

Miti logo

Moroso achieves faster time-to-market and lower prototyping costs with Lectra

Moroso logo

Muebles Liz achieves a 300% increase in cutting capacity and eliminates manual cutting with Lectra's VectorFurniture solution

Muebles Liz logo

Odlo achieves faster product development and lower prototyping costs with Lectra's Modaris 3D

Odlo logo

Orobianco achieves a 50% increase in cutting volume with Lectra's Versalis

Orobianco logo

Polipol achieves full leather-process automation and efficiency gains with Lectra

Polipol logo

Quality Furniture Company speeds time-to-market and improves costing accuracy with Lectra's DesignConcept 3D

Quality Furniture Company logo

Romanita achieves 25% fewer cutting errors and 2% fabric savings with Lectra

Romanita logo

Ruyi Technology Fashion Industry achieves 30% higher production efficiency and 1% improved fabric utilization with Lectra

Ruyi Technology Fashion Industry logo

Signature Seating achieves 40% faster time to market with Lectra's DesignConcept

Signature Seating logo

Staff International achieves faster marker making, fabric savings and fewer physical samples with Lectra's Design to Cost (Diamino)

Staff International logo

Tachi-S Mexico achieves 1,000 car seat sets/day and higher efficiency with Lectra

Tachi-S logo

TAL Apparel Group achieves $2.1M fabric savings and faster pre-production with Lectra Optiplan

TAL logo

Tata Advanced Materials (TAML) achieves major fabric savings, reduced costs and improved cutting quality with Lectra

TATA Advanced Materials logo

Tongtai Infant Finery Co., Ltd achieves 50% reduction in machine downtime and up to 98% system uptime with Lectra Power Advanced services

Tongtai Infant Finery Co., Ltd logo

Toyota Boshoku America achieves faster prototyping and improved cutting accuracy with Lectra's VectorAutoFX

Toyota Boshoku America logo

Trayton Group achieves automation-driven cost savings, consistent cut quality and greater flexibility with Lectra

Trayton Group logo

Wacoal America achieves 20% productivity gain and reduced costs with Lectra's lean cutting-room and Vector solution

Wacoal America logo

Zannier masters childrenswear fit and accelerates development with Lectra Modaris Expert 3D

Zannier logo

No matching case studies