Aggreko B2B Case Studies & Customer Successes

Aggreko logo

Aggreko Global leader in temporary power, temperature control and energy solutions, they enable their customers to achieve their goals through a range of innovative, flexible, class-leading modular solutions. Utilising the latest technologies, they combine innovative thinking with their sector knowledge to deliver the best results; where, when and for as long as needed.

Case Studies

Showing 229 Aggreko Customer Success Stories

search button

360 Productions achieves seamless concert power with Aggreko

360 Productions logo

AGL Loy Yang moves a 2,100-tonne stacker safely with Aggreko power support

AGL Loy Yang logo

API Manufacturing Facility - Customer Case Study

Keeping a construction site on schedule

Ashcourt Group logo

Asian-Based Co-Location Player - Customer Case Study

Too far away to power but not for us

Aurelia Metals logo

Paving the way for cleaner energy future in USA

Austin Energy logo

Auto Parts Manufacturer - Customer Case Study

Bapco achieves zero downtime naphtha production with Aggreko cooling solution

Bapco logo

Avoiding the shutdown of BASF's ammonia plant

BASF logo

Hybridising existing mine´s power delivers big on carbon, fuel and financial savings

Power management solution provides monthly 10:1 payback

BC Operating logo

Powering the fields that power North America

BC Operating logo

Replacing diesel with battery power delivers cheaper and more environmentally friendly energy during turnarounds

Year-round construction support provides triple digit savings

BKI Bachelor & Kimble logo

Defy frost to protect precious vineyard produce

Bordeaux Vineyard logo

CNG power reduces construction costs for new gas plants

Restoring a business community after a flood

Cable Layers Australia keeps Fremantle Hospital powered during maintenance with Aggreko standby power

Cable Layers Australia logo

Cargo Shipping Company - Customer Case Study

Powering A New Cotton Plant In Time For Bumper Harvest

Carroll Cotton Company logo

CC Energy Development achieves zero flaring progress with Aggreko

CC Energy Development logo

Cement kiln gets safer, cooler working conditions

Emergency short-term power for the Ivory Coast

CI-Energies logo

CITIC Pacific Mining achieves 450 MW power plant commissioning with Aggreko load testing and back-up power

CITIC Pacific Mining logo

Cooling a 150-year-old copper mine in NSW

Going for Gold at the Gold Coast Commonwealth Games

Commonwealth Games logo

Commonwealth Games - Customer Case Study

Commonwealth Games logo

Keeping things cool for a salmon hatchery

Cooke Aquaculture logo

Powering a copper mine in the Atacama Desert

Emergency Cooling Solution for International Dairy Manufacturer

Electricity Transmission and Distribution Utility - Customer Case Study

Hybrid grid emulation system reduces emissions

Enel Green Power logo

Energía Solar Cachanilla achieves 48 MW of reliable peak power with Aggreko

Energía Solar Cachanilla logo

EVA Energia achieves 4.5 MW of clean power from landfill biogas with Aggreko

EVA Energia logo

Power automation delivers booster pump cost savings

Powering an oil production site to avoid downtime

ExxonMobil logo

Lights, camera, action with back-up cooling

Providing a turnkey energy storage system in Hawaii

First Wind logo

Flash Entertainment delivers UFC 251 with Aggreko power support

Flash Entertainment logo

Food and Beverage Company - Customer Case Study

General Dynamics Electric Boat saves millions on USS Hartford overhaul with Aggreko power solutions

General Dynamics Electric Boat logo

Glassware manufacturer maximizes production

Global Data Center Hyperscaler achieves precise, on-time data hall testing with Aggreko networked load banks

Keeping a high end fashion show cool in desert

Sustainable construction power for tower cranes: reducing fuel consumption and project emissions

a global leading steel manufacturer maintains 13°C oxygen cooling through summer heat with Aggreko

Dehumidification Solution for Medical Device Plant

A complete drilling cycle without any NPT or failure of Logging tools and huge cost savings

Enabling new development with temperature control

CHP shrinks emissions, costs and boosts reliability for manufacturer

Logistic centre powered before big deadline

Maintaining metal production with precise power and temperature control

One of world's largest renewable microgrids powers remote gold mine

Gold Fields Australia logo

Replacing old engines with new technology

Gold Fields Australia logo

Hybrid solution in the Andes saves millions for mine

Gold Fields Australia logo

Plant up and running 12 hours after critical chiller shut down

Ethylene plant needs fast emergency cooling

Hospital power plan for hurricane season

Gulf Coast Refinery - Customer Case Study

Gulf Coast Refinery - Customer Case Study

Gulf Coast Refinery - Customer Case Study

GV Gold - Customer Case Study

GV Gold logo

Harmony Gold Mine Company - Customer Case Study

Harmony Gold Mine Company logo

Powering a plant with its own natural gas

Hess logo

Temporary cooling system keeps hospital open

Hydrocarbon Exploration Company - Customer Case Study

Behind a world first clean energy solution

Freezing an ice rink for an ice hockey series

Ice World logo

Monetising APG for an Operator by exporting power to the grid

Independent Oil Company - Customer Case Study

Peak power shaving for a caribbean island

Using battery power to reduce the costs and emissions at a major sporting event

International Oil Company keeps a new offshore platform ship-shape with Aggreko cooling and power

Wind power minimises decommissioning maintenance costs

Accelerating decommissioning during oil price slump

How Aggreko powered an unprecedented Tokyo 2020 Olympic Games

Quickfire cooling for Covid-19 triage at hospital

Jefferson Davis Electric Cooperative - Customer Case Study

Jefferson Davis Electric Cooperative logo

Efficient and cost effective HFO power plant for Madagascar

New HFO power plant for off-grid gold mine gives peace of mind

Kinross logo

Complex renovation of a congressional building

Kirlin Mechanical logo

Improved grid and less diesel for Kodiak Island

Kodiak Electric Association logo

Natural gas mining reduces costs and emissions

Labyrinth Resources logo

Power restored within one hour of failure

Large Agriculture Company - Customer Case Study

Cooling designed for sustainable aquaculture

Luxury high-rise warmed by low-cost hydronic heating

a large producer of building systems and construction products avoids downtime with Aggreko backup power

Dehumidification improves quality control, saves fortune

Emergency replacement chiller for refinery

Precise cooling keeps Metro station construction safe

Data center keeps its cool during upgrade

Transforming a New York university soccer field into a temporary hospital

Large Exploration and Production Company - Customer Case Study

Cooling 270° oil for a food production plant

Large Gold Mine - Customer Case Study

On-demand air returns plant to operations

Powering a new plant during extensive delays

Keeping a mill running during a turbine repair

Temporary cooling keeps mine at full capacity with reduced water use

Engineering a novel solution for gas to power drilling rigs

Large Oil Company - Customer Case Study

a Petrochemical Plant completes turnaround on time with Aggreko emergency AC and power support

Keeping plant operations on track with ROC

Efficient gas power helps manufacturing plant avoid costly outages

Full productivity during scheduled shutdown

Large Refinery - Customer Case Study

a large refinery achieves uninterrupted production with Aggreko's off-grid power plant

Flareless decontamination reduces emissions

Desalter effluent water cooling, preventing corrosion and shutdowns during the summer months

Tent cooling system reduce refinery's risks

Large Scottish Salmon Fishery - Customer Case Study

Powering a mine at the top of the world

Powering up fast during emergency maintenance

Helping T&D companies realize capital quicker and expedite grid improvements

LarMac achieves a spectacular 50th National Day event with Aggreko power solutions

LarMac logo

Powering a major live football event broadcast

Leading Broadcast Network - Customer Case Study

Leading Energy Company - Customer Case Study

Optimised CHP package delivers savings for pharmaceutical giant

a leading global colocation company secures temporary data centre power with Aggreko gas generators and battery storage

LNG Tank Vessel - Customer Case Study

Logistics Events Australia achieves faster ice rink and slide turnaround with Aggreko reverse cycle chillers

a luxury car manufacturer achieves maximum production with Aggreko cooling

Luxury Resort and Hotel - Customer Case Study

MainPower Ltd - Customer Case Study

MainPower Ltd logo

Turbine dehumidification saves time and money during fossil fuel plant maintenance outage

Major International Oil and Gas Company - Customer Case Study

Grid on Demand improves capital productivity and safety

Massive gas power system brings a new cryogenic gas plant online

Scalable power generation with ultra-low emissions

a major oil and gas operator achieves safe, delay-free pipeline commissioning with Aggreko mobile power solutions

Keeping things safe during a safety upgrade

Patented fast reactor cooling for major Turnaround at a large US refinery

a major refining company achieves 100% uptime during a large-scale turnaround with Aggreko

Major Sporting Organising Committee - Customer Case Study

Delivering power and heat for microtunneling

Temporary generators help restore community at Pukatawagan

Manitoba Hydro logo

Powering a massive hydro dam construction

Manitoba Hydro logo

A futureproof power offering for a sudanese gold mine

Harnessing waste gas to deliver savings

Maurel & Prom logo

Methagri Factory - Customer Case Study

Aggreko’s battery power solution significantly cuts generator runtime and fuel costs

Miami Botanical Garden logo

Mid-Continent Refinery - Customer Case Study

Morningside Electrical - Customer Case Study

Morningside Electrical logo

a multinational brewing and beverage company avoids harvest-season outages with Aggreko backup power

Full offshore platform commissioning support

NamPower - Customer Case Study

NamPower logo

Uninterrupted power during bird nest repositioning

National Grid logo

Helping T&D Companies realize capital and expedite grid improvements

National Grid logo

a National Oil Company and IOC JV reduces NPT by 60% with Aggreko’s remote power and monitoring solution

Nationally Known Cable Sports Network - Customer Case Study

Clean efficient offshore power for oil platform

Neptune Energy logo

Solar Hybrid power cuts costs and emissions

Nevsun logo

Remotely manage pumps and meeting emission standards

NOC/ IOC Joint Venture achieves higher propylene yield with Aggreko process enhancement

Providing power to a refinery in an extremely hostile environment to restart production

NRC Iraq logo

Nuclear Power Plant - Customer Case Study

Cooling things down in nuclear facility

Offshore Platform - Customer Case Study

an offshore platform operator extends platform life and boosts output with Aggreko power solutions

Keeping living quarters cool with temporary chillers

Enable Production of 250,000 barrels of oil per day with a Customized heat Exchanger Solution

Powering a Microgrid with Aggreko’s Rapid Deployment Natural Gas Generators

Oil and Gas Company - Customer Case Study

an oil company achieves lower emissions and 165 MW grid power with Aggreko Flare Gas to Power

Keeping a turnaround on the right side of regulations

Powering up an oil sands construction site

Off-grid power keeps wind farm on track

Opening opera doors using flexible ventilation

Opera Zuid logo

Virtual gas power plant minimises emissions for miner

Ora Banda Mining logo

Orbital ATK - Customer Case Study

Orbital ATK logo

Next generation technology to reduce costs and environmental impact in Argentina

Pampa Energía logo

Panasonic - Customer Case Study

Panasonic logo

PBE Ensham Operations achieves rapid commissioning with Aggreko cooling solution

A custom heating solution from start to finish

PCL Construction logo

Permian Basin Company - Customer Case Study

Combatting aging power infrastructure and an unreliable grid

Petrochemical Plant - Customer Case Study

Refinery executes a flawless turnaround without diesel generators

Utilities contingency plan for vaccine development

Reactor cooling for Pharmaceutical API Production

Efficient, cleaner power for oil field in desert

Pipeline testing support services shorten commissioning process

Reliable power to help feed a country during pandemic

Port of Singapore Authority logo

Meeting heat, hot water and steam demand for new facility

Powering the construction of two substations

a private hospital achieves safe operating theatre cooling with Aggreko chillers

Property Restoration Contractor - Customer Case Study

Keeping noise and emission low and energy reliability high in housing estate

Pump supplies logo

Ensuring Ideal Environment For Exhibition Centre

RAI Amsterdam logo

Regional Sand Provider - Customer Case Study

Powering midstream operations using LNG to meet emissions regulations

A sustainable solution for emergency power

Cost effective hybrid power that lowered gold production costs

Resolute Mining Limited logo

Critical contingency cooling for mine crusher circuit

Rio Tinto logo

Ryder Cup - Customer Case Study

Ryder Cup logo

Sabah Electricity Sdn Bhd - Customer Case Study

Sabah Electricity Sdn Bhd logo

Making a splash with ROC in San Francisco

Battery hybrid solution brings emission and cost cuts

Scottish Power Renewables logo

Providing temperature control and temporary power to community recovery facilities in Singapore

Singapore Government logo

Smoky River Coalfield Mine - Customer Case Study

Rapid and modular power solution to commission world’s largest stacker for ambitious mine project

Cooling nitrogen for ammonia production plant

Smart cooling makes savings for refinery

An unusual solution to a cooling problem

Ensuring oil-free compressed air during a shutdown

Quickly adapting power requirement for paper and pulp manufacturing plant

Tempo Paper logo

Providing urgent power after Japanese tsunami

Tepco logo

Emergency power for the Theatre Royal

Theatre Royal logo

Hybrid solution supports grid and reduces emissions

Powering hurricane relief in Puerto Rico

Tote Maritime logo

Clean LPG energy for an island community

Virgin Islands Water and Power Authority logo

Water Reclamation Plant - Customer Case Study

Welbeck Electricity Distribution Ltd achieves zero downtime and 40% cost savings with Aggreko gas generators

Welbeck Electricity Distribution Ltd logo

Critical comms continue with our clean, clever energy

Wessex Water logo

Increasing efficiencies with lower operating temperatures

Upgrading to a natural gas plant on time

Turbines tested with temporary mini-grid

Providing power in the most remote location

Modified generators power offshore wind farm

WindMW logo

a world class offshore infrastructure company achieves safe jack-up rig refurbishment with Aggreko power and load bank support

one of the largest gold mining groups in the world achieves cooler underground mine conditions with Aggreko

Powering a record-breaking, rock ‘n’ roll New Year’s Eve concert

How to cure a 1MM sq. ft. concrete slab in the winter

Powering And Cooling The Ultimate Festival For Millions Of People

Wyoming Mining achieves 24/7 Bitcoin mining power with Aggreko gas generators

Wyoming Mining logo

Using natural gas to fight death valley heat

Xanterra Parks and Resorts logo

No matching case studies