Case Study: a Petrochemical Plant completes turnaround on time with Aggreko emergency AC and power support

A Aggreko Case Study

Preview of the Large Petrochemical Plant Case Study

Temporary cooling solution avoids massive loss

A large petrochemical plant in Saudi Arabia faced a critical challenge when an AC unit, part of a rental from Aggreko via a subcontractor, broke down during a major turnaround. This emergency threatened to halt production and cause millions in losses. The plant directly requested that Aggreko provide additional emergency temperature control and power generation to mitigate further risk and prevent costly downtime.

Aggreko responded immediately, with a technician and replacement unit onsite within an hour. The vendor ultimately supplied an additional 11 AC units and 9 power generators from its local depot, all mobilized on short notice with five technicians to oversee the project. This rapid response ensured the petrochemical plant completed its turnaround on time with absolutely no impact on production, preventing any revenue loss.


Open case study document...

Aggreko

229 Case Studies