Zuken B2B Case Studies & Customer Successes

Zuken logo

Zuken is a global provider of leading-edge software and consulting services for electrical and electronic design and engineering. Founded in 1976, Zuken has the longest track record of technological innovation and financial stability in the electronic design automation (EDA) software industry. The company’s extensive experience, technological expertise and agility, combine to create world-class software solutions. Zuken’s transparent working practices and integrity in all aspects of business produce long-lasting and successful customer partnerships that make Zuken a reliable long-term business partner.

Case Studies

Showing 34 Zuken Customer Success Stories

search button

Alstom improves productivity and planning with Zuken's E3.series

Alstom logo

Arburg achieves error-free high-speed PCB designs and faster development cycles with Zuken CR-5000

Arburg logo

ARM Automation achieves two-thirds (66%) electrical design time reduction with Zuken E³.series

ARM Automation logo

ATK achieves major cable-design productivity gains and cuts feasibility testing from months to weeks with Zuken E³.series

ATK logo

BAE Systems achieves 98% wiring reduction in turret control computer with Zuken's CADSTAR

BAE Systems logo

BCA Leisure achieves rapid, error-free harness design and competitive responsiveness with Zuken's E3.series

BCA Leisure logo

Bruker achieves improved wiring documentation and faster design flow with Zuken’s E³.series

Bruker logo

dB Broadcast achieves reliable signal integrity and agile PCB development with Zuken CADSTAR

dB Broadcast logo

Electroflight fast-tracks development of a 300mph all-electric aircraft with Zuken’s E3.series

Electroflight logo

Emergency One controls wire-harness complexity and slashes delivery lead times with Zuken's E³.series

Emergency One logo

Endress+Hauser achieves PCB standardization and design reuse with Zuken

Endress+Hauser logo

GreenGT achieves faster prototype development and reduced wiring errors with Zuken's E3.series

GreenGT logo

Haulotte Chooses Zuken for Integration with ARAS PLM

Haulotte logo

Hydro-Québec doubles greenfield substation design productivity with Zuken E3.series

Hydro Quebec logo

Making environmentally friendly coating technology affordable

INORCOAT logo

Kässbohrer Transport Technik achieves 60–90% reduction in electrical documentation turnaround for custom vehicle configurations with Zuken E³.series

Kässbohrer Transport Technik logo

Kellenberger achieves 90% reduction in customer-specific schematic generation time with Zuken E³.series

Kellenberger logo

KRONE achieves integrated ECAD–MCAD–ERP design and reduced harness costs and lead times with Zuken E3.series

KRONE logo

M-H engineering - Customer Case Study

M-H engineering logo

Malvern Instruments achieves first-time PCB fit and improved ECAD–MCAD collaboration with Zuken's CADSTAR Board Modeler Lite

Malvern logo

Mecalac halves cable-harness development time and achieves right-first-time designs with Zuken E3.series

Mecalac logo

Müller Martini achieves streamlined variant and option handling and reduced manufacturing costs with Zuken E³.series

Müller Martini logo

Olivetti introduces complex, IoT-enabled products with confidence by switching to CADSTAR

Olivetti logo

Omexon uses E3.series to streamline workflows, reduce design time, and ensure compliance with stringent industry standards

Omexom logo

ONTEC achieves 86% faster analysis and on-time EMI-compliant product delivery with Zuken

ONTEC logo

Pantec Automation achieves around 50% faster machine delivery and reduced product costs with Zuken E3.series

Pantec Automation logo

Using Zuken's CR-8000 and DS-CR Pizzato Elettrica creates a systematic order in data and project management

Pizzato Elettrica logo

Renishaw achieves improved fit and impedance control for complex flexible PCBs with Zuken's CR-8000

Renishaw logo

Rohde & Schwarz achieves efficient variant management and schematic-driven manufacturing with Zuken’s CR-5000

Rohde & Schwarz logo

Stone Aerospace achieves 12-week cable design reduction and $20,000 savings with Zuken's E³.series

Stone Aerospace logo

TEWS Technologies achieves reduced development time and manufacturing costs for complex high‑speed PCBs with Zuken's CADSTAR Power Integrity Advance

TEWS logo

Toshiba achieves major module size and thickness reduction with Zuken CR-8000 Design Force

Toshiba logo

Weidmüller achieves up to 75% reduction in cabinet engineering with Zuken

Weidmuller logo

Data conversion as a foundation for a future-oriented development process in electrical and pneumatic control technology

Windmöller & Hölscher logo

No matching case studies