Case Study: GreenGT achieves faster prototype development and reduced wiring errors with Zuken's E3.series

A Zuken Case Study

Preview of the GreenGT Case Study

GreenGT chooses Zuken for the wiring of its hydrogen-powered vehicles

GreenGT SA, a Swiss developer of high-performance hydrogen fuel-cell drive systems, faced the challenge of speeding prototype development without compromising safety or reliability in complex electrical schematics and wiring harnesses. To address tight timelines in a rapidly evolving hydrogen industry, GreenGT selected Zuken’s E3.series (notably E3.cable and E3.Formboard) to standardize and accelerate its electrical design work.

Zuken delivered E3.series with parameterizable schematic pages, an easy-to-use component library, dynamic interaction between E3.cable and E3.Formboard, and fast technical support, enabling closer collaboration between schematic and harness engineers. The Zuken solution shortened development cycles, reduced technical back-and-forth with suppliers, and minimized design and production errors—helping GreenGT cut prototype development time and produce reliable wiring harnesses more quickly.


Open case study document...

GreenGT

Jérôme Bernard

Head of the Embedded Systems Department


Zuken

34 Case Studies