Pantec Automation, a Liechtenstein-based designer and manufacturer of control systems, faced pressure from customers losing business to lower‑cost copied machinery and needed to help them cut costs, shorten delivery times, and protect IP. To do this it expanded use of Zuken’s E3.series and integrated it into its processes so modular, variant-rich machines could be specified, quoted and produced more efficiently.
By integrating Zuken’s E3.series with its ERP/PPS and building a Configurator with a decision‑tree for valid options, Pantec Automation automated electrical planning and BOM generation so 95% of projects go straight to assembly. The result: quotes delivered in days, order‑to‑delivery slashed from about 15 to 8 weeks (≈50%), lower product costs and reduced IP risk — all achieved using the existing E3.series setup at no extra cost.
Markus Hanefeld
Sales Manager