Assignar B2B Case Studies & Customer Successes

Assignar logo

Assignar is a cloud based compliance, asset and workforce management platform for highly regulated industries. Developed from first hand experience and the need to solve the challenges within a fast growing construction service provider, Assignar rapidly gained interest from stakeholders in other highly regulated industries. Assignar delivers its customers increased efficiency, transparency and significant management cost savings.

Case Studies

Showing 73 Assignar Customer Success Stories

search button

Aaction Traffic - Customer Case Study

Aaction Traffic logo

Abletech Underground Group - Customer Case Study

Abletech Underground Group logo

Active Crane Hire achieves real-time maintenance management for 170+ tower cranes with Assignar

Active Crane Hire logo

Active Energies Solar achieves a 30% reduction in rework and streamlined communications with Assignar

Active Energies Solar logo

Affective Rail achieves real-time data insights and streamlined timesheets with Assignar

Affective Rail logo

All Types Of Rubbish achieves safety & environmental compliance and rapid waste reporting with Assignar

All Types Of Rubbish logo

Allroad Group achieves depot-free operations and 60% efficiency gains with Assignar

Allroad Group logo

ATC achieves streamlined quality control and audit-ready compliance with Assignar

ATC logo

How Aussie Excavators Plant Hire Is Keeping Up A 30-year Legacy By Adapting With Assignar

Aussie logo

Transforming Operations and Safety Management at Aussie Excavators Plant Hire

Aussie logo

Blacktown Waste Services - Customer Case Study

CJ's Demolition achieves a paperless, mobile workforce and efficient crew allocation with Assignar

CJ's Demolition logo

Classic Electric and Consulting achieves streamlined operations and data fluidity with Assignar

Classic Electric and Consulting logo

Denver Asphalt & Concrete Services (DACS) achieves a 50% increase in remote working capacity with Assignar

DACS logo

Deverni - Customer Case Study

Deverni logo

How Accurate Field Data Helps Don Mann Excavating Grow

Don Mann logo

DPW Plant Hire uses Assignar to Automate their Compliance Process

DPW Plant Hire logo

Duron Atlantic scales team three‑fold and slashes admin overhead with Assignar

Duron Atlantic logo

Dynamic Hydro Excavations - Customer Case Study

Dynamic Hydro Excavations logo

East Coast Traffic Control uses Assignar to Maximise Operational Efficiency

East Coast Traffic Control logo

Managing Three Family Businesses with Assignar

Enteq logo

Fluren achieves $10,000 annual savings and faster timesheet processing with Assignar

Fluren logo

Force Civil Solutions controls compliance and manages project progress with Assignar

Force Civil Solutions logo

How Force Civil Uses Assignar To Boost Margins

Force Civil Solutions logo

How Formula Alberta Improved Safety Efficiency

Formula Alberta logo

Hi-Range Crane Forks achieves operator empowerment and streamlined rail operations with Assignar

Hi-Range Crane Forks logo

I Can Dig It Excavation saves 5 hours daily and centralises field operations with Assignar

I Can Dig It Excavation logo

Infraworks Plumbing wins major Sydney Water contract with Assignar

Infraworks logo

Infraworks achieves 50% more efficient allocations and improved compliance with Assignar

Infraworks logo

How J&S Drilling Improves Efficiency & Reduces Downtime

J&S Drilling logo

JBG Contractors achieves scalable growth and reduced admin costs with Assignar

JBG Contractors logo

Jim's Electric achieves a 30% reduction in payroll time with Assignar

Jim's Electric logo

Kwik Logistics saves 4 hours a day and $35k per year

Kwik Logistics logo

How Larcon Electric Keeps Cash Rolling in with Assignar

Larcon Electric’s logo

Load 28 achieves streamlined multi-state workforce and timesheet management with Assignar

Load 28 logo

MannGroup achieves accurate job costing and faster payroll with Assignar

Manngroup logo

How Real-Time Reporting Improves Efficiencies with Martinus Rail

Martinus Rail logo

Martinus Rail uses Martinus Rail uses Assignar to Dispatch the Right Field Teams with the Right Resources to the Right Projectsssignar to dispatch the right field teams with the right resources to the right projects

Martinus Rail logo

Mayberry Construction streamlines document access and asset management with Assignar

Mayberry Construction logo

How MCC Contractors Diversified and Grew with Assignar

MCC Contractors logo

NDEA uses Assignar to Improve Plant Maintenance and Staff Management

NDEA logo

NPW Contracting, Inc. saves 1,320 man‑hours and $48,000 per year with Assignar

NPW Contracting, Inc. logo

OE Construction achieves $30,000 in payroll savings and streamlined field reporting with Assignar

OE Construction logo

How Oe Construction Answers The 'why' Questions In Minutes With Assignar Insights

OE Construction logo

Penington Painting Company’s Path to Success with Assignar

Penington Painting Company logo

Perfect Hire achieves ISO compliance and streamlined worker & equipment management with Assignar

Perfect Hire logo

Prime Build streamlines workplace health & safety and saves time with Assignar

Prime Build logo

Rcc Civil Digitized Their Job Site Paperwork And Reduced Payroll Admin By 93%

RCC Civil logo

Optimizing Workforce Management with Resolve Marine

Resolve Marine logo

Retro Traffic streamlines field-to-office communication and boosts productivity with Assignar

Retro Traffic logo

Safedig Services achieves paperless jobsites and real-time operational visibility with Assignar

Safedig Services logo

Controlling Data Chaos With Sbl Solutions

SBL Solutions logo

SBL Solutions manages 100+ employees across Australia

SBL Solutions logo

Simcat Group uses Assignar to Improve Visibility and Communication Across their Team

Simcat Group logo

Solution Plant Hire achieves streamlined fleet management and compliance for 150+ assets with Assignar

Solution Plant Hire logo

SPR Traffic Services LP achieves a 67% reduction in scheduling time with Assignar

SPR Traffic Services LP logo

Stefanutti Construction uses Assignar to Allocate their Fieldworkers and Machines Efficiently

Stefanutti Construction logo

How Stonescapes Made The Ultimate Upgrade From Pen And Paper With Assignar

Stonescapes logo

How Field Data Keeps Subterra Civil Building

Subterra Civil logo

Sunraysia Crane & Rigging achieves faster scheduling, compliance and clearer field communication with Assignar

Sunraysia logo

Superior Traffic Management achieves efficient payroll and streamlined operations with Assignar

Superior Traffic Management logo

Swilly Traffic Solutions achieves interstate growth and streamlined operations with Assignar

Swilly Traffic Solutions logo

Sydney Civil Uses Assignar To Drive Efficiency And Increase Productivity

Sydney Civil logo

Target Zero Group achieves paperless, real-time document and asset management with Assignar

Target Zero Group logo

How Barricade Scaled With Assignar

The Barricade Company logo

The Barricade Company saves up to $90,000 and scales operations with Assignar

The Barricade Company logo

Thoutt Bros. Concrete Contractors reduces inefficiencies and gains real-time visibility with Assignar

Thoutt Bros. Concrete Contractors logo

Traffic Force Uses Assignar To Connect 3 Depots Across Western Australia

Traffic Force logo

Traffic Logistics achieves rapid scaling and wins major projects with Assignar

Traffic Logistics logo

From Paper Forms To Real-time Feedback

TZ Civil logo

Ultra Engineering Saves 3.5 Days and 144 Miles Per Week with Assignar

Ultra Engineering logo

When Rail Contractors Go Digital With Assignar

Vision Industrial Services logo

Workzone Traffic Control - Customer Case Study

Workzone Traffic Control logo

No matching case studies