Assignar
75 Case Studies
A Assignar Case Study
Stonescapes, a commercial concrete and paver contractor in Las Vegas, was struggling to keep up with growth while relying on handwritten timesheets and handwritten schedules. Their paper-based process was slow, hard to scale, and left the team a day behind on payroll and job-cost data, making it difficult to monitor budgets and forecasting in real time.
Stonescapes implemented Assignar, integrated with Acumatica, to digitize timekeeping, scheduling, forms, and work planning. With Assignar, crews enter time on phones or iPads, job and cost codes are pre-populated and controlled, and the office can see accurate data almost immediately. The result was up to 16 hours saved per week, fewer errors, faster budget tracking, and better visibility into job performance.
Carson Driscoll
Field Operations