Case Study: Jim's Electric achieves a 30% reduction in payroll time with Assignar

A Assignar Case Study

Preview of the Jim's Electric Case Study

Jim's Electric uses Assignar to cut time on payroll by 30%

Jim's Electric, an electrical contractor founded in 2006 in Medicine Hat, Alberta, was growing into more and larger projects and found its paper-based processes — especially timesheets and payroll — unsustainable. After evaluating options, the company adopted the Assignar field operations management platform to replace manual work orders and handwritten timesheets.

Assignar implemented scheduling, charge item tracking, data export and reporting, with hands-on support from a Customer Success Manager, enabling Jim's Electric to automate timekeeping and streamline end-of-month routines. The change cut payroll processing time by about 30% (saving roughly a full day), reduced lost documents, increased completed work orders, and improved billing accuracy and cash collection — boosting overall operational efficiency with Assignar.


Open case study document...

Jim's Electric

Lanny Meier

Office Manager


Assignar

73 Case Studies