Statoil

Case Studies
Showing 11 Statoil Customer Success Stories
PowerDrive Xcel Rotary Steerable System Helps Save 5 Days of Drilling Time in Statfjord Field North Sea
Statoil Evaluates Cement Placement and Bond in Casing Diameters from 133/8 to 20
OptiDrill Service Eliminates 18-in Liner, Saves Statoil 10 Rig Days in Deepwater Exploration Well
Combined Solution Methodology Aids Statoil with Subsea Tieback Design
Dual-Reamer Rathole-Elimination RSS BHA Saves 1.5 Drilling Days USD 425,000 for Statoil
Statoil Reaches Section TD in One Run in High-Well-Density Statfjord Field
Advanced Testing and Completion Fluid Development Improve Operational Safety and Well Performance
Statoil Improves Lateral Stability in Shale Horizontal Section Using PDC Bit with Central Stinger Element
Advanced EPCON Dual Compact Flotation Unit Improves Produced Water Treatment by 27%
MaxTRAC Tractor Navigates Restriction for Production Logging a Highly Deviated Well
No matching case studies