The French Alternative Energies and Atomic Energy Commission (CEA) faced the challenge of rehearsing highly complex and hazardous operations for its nuclear fusion reactors. Before building physical mockups, CEA needed a way to safely simulate intricate procedures, such as the 500-step process of removing a reactor component, which must be performed by operators in restrictive suits under time-sensitive radiation exposure. To solve this, CEA turned to vendor Unity to create high-fidelity interactive simulations.
Using Unity's real-time 3D platform, including tools like Unity Asset Transformer, CEA built a massive, interactive simulation from its CAD data. This solution allowed teams to validate procedures and human factors digitally, which dramatically reduced physical prototyping needs. The result was a significant reduction in operator radiation exposure by eliminating unnecessary steps and cutting procedure times. By simulating first with Unity, CEA now builds only one physical mockup, achieving major time and cost savings.