Case Study: Cool Sips saves 20% on kitchen equipment installation with ResQ

A ResQ Case Study

Preview of the Cool Sips Case Study

Cool Sips saves 20% on kitchen equipment installation with ResQ

Cool Sips, a New York City-based beverage company, faced a challenge during a new store buildout when their regular contractor was unavailable to complete a time-sensitive kitchen equipment installation. They needed a qualified vendor to handle the comprehensive project while navigating local regulations and maintaining their opening timeline. They turned to ResQ to find a solution.

Using the ResQ platform, Cool Sips was quickly matched with a qualified vendor who provided a fast quote and scheduling. The ResQ-supported project was executed efficiently, meeting all compliance requirements. This solution resulted in approximately 20% cost savings on the installation compared to market rates, while also ensuring the work was completed quickly to meet the store's opening deadline.