Case Study: TL Circle achieves 50% faster field-to-finish time with Matterport

A Matterport Case Study

Preview of the TL Circle Case Study

TL Circle cuts field-to-finish time by 50%, enhances BIM process in Revit with Matterport point clouds and visuals

TL Circle, led by Aryn Bergman, faced major challenges modeling complex mechanical rooms. Traditional measurement and Revit modeling were time-consuming, with a contractor spending 4–5 hours capturing a boiler room and an engineer needing another 4–5 days to build the model, plus possible extra site visits.

Using Matterport’s Pro3 scanning and point cloud workflow, TL Circle reduced measuring time by 60% and made Revit modeling 40% faster. Matterport ultimately cut field-to-finish time by 50%, streamlining the process and improving efficiency on complex projects.


View this case study…

TL Circle

Aryn Bergman

Lead Engineer and Founder


Matterport

129 Case Studies