KEMP Technologies
52 Case Studies
A KEMP Technologies Case Study
The customer, F5, faced the challenge of managing complex and script-based iRules for intelligent traffic routing on their Big-IP application delivery controllers, which required significant development and maintenance effort. To replace this system, they turned to vendor Kemp Technologies and its LoadMaster application delivery controller (ADC) solution.
Kemp implemented its LoadMaster ADC, which features an intuitive user interface and powerful content switching capabilities that can be configured without extensive scripting. The solution successfully migrated the functionality of F5's iRules to Kemp's platform using a dedicated migration tool, resulting in a simplified and more manageable traffic routing system. Kemp provided a free 30-day evaluation of the LoadMaster to facilitate the transition.