ITC Infotech
211 Case Studies
A ITC Infotech Case Study
ITC Infotech worked with a global steel manufacturer that faced challenges with inaccurate planning due to a reliance on informal data and suboptimal resource utilization, which reduced efficiency. The customer also lacked the ability to track key production and transportation KPIs in real-time, severely impacting its operational visibility and performance.
The solution implemented by ITC Infotech utilized Quintiq software for master production planning, scheduling, and order management. This enabled rule-based order fulfillment and real-time tracking through integrations with SAP and MES systems. As a result, ITC Infotech helped the customer achieve better visibility, optimize resources, reduce downtime, speed up deliveries, and ultimately enhance its overall delivery performance.
Global Steel Manufacturer