Case Study: Fiotec achieves flexible work and 20% cost savings with GoTo Connect

A GoTo Case Study

Fiotec saves 20% and enables flexible work with GoTo Connect

Fiotec, a private non-profit foundation supporting the Oswaldo Cruz Foundation (Fiocruz), faced a challenge in modernizing its communications infrastructure. This need was accelerated by a move to a larger headquarters and the Covid-19 pandemic. After analyzing the market, Fiotec chose the GoTo Connect solution from vendor GoTo for its ease of use and ability to centralize phone management.

By implementing GoTo's cloud-based solution, Fiotec enabled a flexible work model for its employees. The vendor's product eliminated the need for physical switch services, which resulted in Fiotec saving 20% in costs with GoTo Connect.


View this case study…

GoTo

234 Case Studies