Contruent
41 Case Studies
A Contruent Case Study
Low Level Waste Repository, a nuclear waste management organization in Holmrook, UK, needed better enterprise reporting and earned value management while reducing spreadsheet dependence and improving control over data. It faced challenges including inconsistent spreadsheet reports, weak audit trails and data configuration controls, limited flexibility, and strict customer EVM requirements.
Contruent implemented Contruent Enterprise as an integrated project lifecycle management solution that connected with Primavera P6 and SAP, streamlined enterprise and project reporting, and met EVM requirements. The result was a single source of truth, faster reporting with accurate and timely data in the required format, stronger confidence in data, and better support for the company’s growing needs.
Sarah Moore
Project Controls Manager