Case Study: Iberdrola achieves end-to-end control of Europe’s largest green hydrogen plant with CGI

A CGI Case Study

Preview of the Iberdrola Case Study

Iberdrola powers Europe’s largest green hydrogen plant with CGI

The customer Iberdrola, a pioneer in the energy transition, faced the challenge of managing and monitoring Europe's largest green hydrogen plant for industrial use. They needed an end-to-end solution to guarantee the complete manufacturing process and integrate it with renewable energy systems. Iberdrola chose vendor CGI to implement a production control solution based on their previous successful collaborations.

CGI implemented a standardized, end-to-end control solution that provides real-time monitoring and remote control of the plant's operations. The results for Iberdrola include increased operational efficiency, reduced costs, and support for their strategic decarbonization goals. The Puertollano plant, which prevents 48,000 tCO2/year, established a replicable framework, and CGI is now working with Iberdrola on subsequent projects to integrate multiple plants into a central Control Center.


View this case study…

CGI

300 Case Studies