Design-Stage Cost Insight Drives Speed and Savings for CNH

CNH Industrial, maker of agricultural and construction equipment under brands like Case and New Holland, is a global operation with 60,000+ employees, 67 manufacturing plants and 56 R&D centers serving 180 countries. Facing tight, seasonal development windows, CNH needed a way to catch cost and manufacturability issues during the initial design phase to avoid time-consuming redesign loops and keep projects on schedule.

CNH piloted aPriori’s digital manufacturing simulation with a small design team to give designers fast, detailed cost and manufacturability feedback, enable quick “what-if” sourcing comparisons, and train less-experienced engineers. Within months the team identified $312,000 in annual savings (including $143,820 on a shank cultivator and $97,659 from a turnbuckle redesign), accelerated cost-analysis cycles, and scaled the solution across the company—reaching roughly 900 users by late 2022—while standardizing cost modeling and improving supplier negotiations.


Open case study document...

CNH Industrial

Jegan Dhanapal

CNH Industrial


aPriori

38 Case Studies