ACOEM
34 Case Studies
A ACOEM Case Study
A major player in the HVAC industry faced significant financial losses due to microscopic holes in its aluminum tubes. The complexity of its manufacturing process made identifying the root cause extremely difficult, forcing the company to perform costly, preemptive bearing replacements every 48 hours. They sought a solution from ACOEM to implement a sustainable condition monitoring strategy.
ACOEM implemented an integrated ecosystem combining its MV-x for real-time vibration analysis and Sparrow wireless sensors, all accessible through the Nest Vision platform. With dedicated expert support from an ACOEM Advisor contract, the company can now identify bearing defects earlier. This has positioned them to optimize replacement strategies, reduce maintenance costs, and improve product quality, with plans to expand the system to additional production lines.
A major player in the HVAC industry, specializing in aluminum tube manufacturing