Case Study: Veridiam achieves tight tolerance control, reduced scrap and on-time delivery with Zontec's Synergy 2000 SPC

A Zontec Case Study

Preview of the Veridiam Case Study

Veridiam Uses Synergy to Maintain Tight Tolerances Required by Its Customers

Veridiam Inc., one of the world’s largest contract manufacturers of precision components for medical, aerospace, semiconductor and other industries, needed to maintain extremely tight tolerances across its production processes to meet strict customer requirements. To address this challenge, Veridiam deployed Zontec’s Synergy 2000 SPC software on the shop floor to monitor parts and processes in real time.

Zontec’s Synergy 2000 provided networked, real-time statistical process control with capability and run charts for frequent customer audits, immediate graphing as operators enter data, and tools for continuous improvement. As a result, Veridiam achieved measurable benefits—reduced scrap, reduced rework, lower costs and improved on-time delivery—while maintaining process control and meeting customer audit requirements.


Open case study document...

Veridiam

Dave Ibanez

Vice President of EC Operations


Zontec