Zonar Systems
53 Case Studies
A Zonar Systems Case Study
PAR Electrical Contractors (PAR), a Quanta Services company and one of North America’s largest outside-plant electrical contractors, operates thousands of pieces of equipment across multiple states and frequently mobilizes for storm restoration. PAR faced time-consuming, paper-based tracking that made it hard to prove where equipment and engine hours were logged for apportioned taxes and CARB compliance, ensure mandatory vehicle inspections, and accurately document usage for billing after large-scale responses like Hurricane Ike.
PAR deployed Zonar’s HD‑GPS and EVIR electronic inspection systems to automatically capture equipment location, engine hours and verified pre/post-trip inspections. The result was precise, auditable reporting that reduced regulatory and billing risk, enabled same‑day repairs instead of five days, improved equipment allocation (servicing ~10–25% more vehicles), and sped disaster billing and fleet response—delivering measurable time and cost savings and higher customer satisfaction.
Rick Roton
Director of Fleet Operations