Case Study: Leadway Pensure PFA achieves near-zero RPOs and fast SQL Server recovery with Zerto Virtual Replication

A Zerto Case Study

Preview of the Leadway Pensure PFA Case Study

Leadway Pensure Protects Microsoft SQL Server with Zerto Virtual Replication

Leadway Pensure, a Nigerian pension fund administrator, needed robust BC/DR for mission‑critical systems—especially a rapidly changing 2 TB Microsoft SQL Server VM—after VMware SRM/vSphere Replication, Veeam and DoubleTake failed to meet RPO/RTO, bandwidth and failback requirements. The company required seconds‑level recovery points, write‑order fidelity, non‑disruptive testing and a simple, reliable failback process to avoid financial impact from downtime.

Zerto Virtual Replication delivered quickly: continuous block‑level replication with seconds‑level RPOs and minute‑level RTOs, preserved write‑order fidelity for application‑consistent recovery, and a journal-based time slider for point‑in‑time restores. Testing was non‑disruptive and easy, failover/failback became one‑click operations, junior admins could manage VPGs, and Leadway reported successful full DR tests and restored confidence in meeting aggressive SLAs.


Open case study document...

Leadway Pensure PFA

Uzah Chinedu

Infrastructure Manager


Zerto

89 Case Studies