Zerto
89 Case Studies
A Zerto Case Study
Leadway Pensure, a Nigerian pension fund administrator, needed robust BC/DR for mission‑critical systems—especially a rapidly changing 2 TB Microsoft SQL Server VM—after VMware SRM/vSphere Replication, Veeam and DoubleTake failed to meet RPO/RTO, bandwidth and failback requirements. The company required seconds‑level recovery points, write‑order fidelity, non‑disruptive testing and a simple, reliable failback process to avoid financial impact from downtime.
Zerto Virtual Replication delivered quickly: continuous block‑level replication with seconds‑level RPOs and minute‑level RTOs, preserved write‑order fidelity for application‑consistent recovery, and a journal-based time slider for point‑in‑time restores. Testing was non‑disruptive and easy, failover/failback became one‑click operations, junior admins could manage VPGs, and Leadway reported successful full DR tests and restored confidence in meeting aggressive SLAs.
Uzah Chinedu
Infrastructure Manager