Case Study: Katten Muchin Rosenman achieves near-zero RTO and fast VM recovery with Zerto

A Zerto Case Study

Preview of the Katten Muchin Rosenman Case Study

Katten Muchin Rosenman - Customer Case Study

Katten Muchin Rosenman LLP’s Sr. Infrastructure Engineer Mansoor H. chose Zerto to strengthen the firm’s business continuity and disaster recovery. With about 1,000 servers and 250 core systems protected (the rest being Tier‑three), the challenge was keeping critical workloads available and quickly recoverable when VMs were corrupted or changes went wrong.

Zerto’s continuous replication with six‑second (and in some cases two‑second) snapshots delivers strong RTOs and RPOs, letting the team roll back moments before an incident and perform two‑click VM restores. The result: reduced downtime, faster recoveries, easier application testing, and measurable ROI that demonstrates clear value to management.


Open case study document...

Katten Muchin Rosenman

Mansoor H.

Sr Infrastructure Engineer


Zerto

89 Case Studies