Zenobē
25 Case Studies
A Zenobē Case Study
The customer, Brinks, initially attempted to electrify its fleet with a small, self-managed pilot. Recognizing that scaling this effort was complex and resource-intensive due to infrastructure constraints and utility upgrades, they required specialist expertise. To overcome this challenge, Brinks partnered with Zenobē for its Electric-Transport-as-a-Service solution.
Zenobē acted as an extension of the Brinks operations team, managing the full program delivery. The solution included installing load control technology, optimizing charging patterns, and handling stakeholder coordination. This enabled the deployment of 25 vehicles in just 12 months. The project is projected to deliver $800,000 in combined fuel and maintenance savings and avoid 1,400 tonnes of CO₂ emissions, establishing a scalable model for national expansion.