Case Study: NASA achieves 2‑month lead-time reduction and 75% cost savings on ISS life‑support hardware with Xometry

A Xometry Case Study

Preview of the NASA Case Study

NASA Partners With Xometry to Fast-track Critical Life Support Systems on the International Space Station

NASA needed to fast-track production of critical components for an air purification unit for the International Space Station to stay on its rocket launch schedule. NASA engaged Xometry for turnkey manufacturing — including CNC machining, post‑processing, and inspection services — to deliver flight‑ready parts for the ECLSS team under an accelerated timeline.

Xometry sourced uncommon large stock and CNC‑machined two single‑body vessels with tight tolerances and sealing surfaces in a 4‑week lead time, cutting lead time by two months and lowering costs by 75%. Xometry’s work reduced what would have been a 3‑month in‑house build to one month, and kept NASA’s air purification unit on track for the NG‑15 Cygnus 2021 launch.


Open case study document...

NASA

Jimmy Hill

Lead Mechanical Design Engineer


Xometry

65 Case Studies