A fortune 100 consulting group was tasked with building a new net-zero facility with a high-energy industrial load while evaluating multiple potential sites. Their challenge was to develop a mixture of on-site generation and an independent power producer/power purchase agreement (IPP/PPA) to meet the facility's significant power demands.

Xendee provided the solution by simultaneously modeling both behind-the-meter and in-front-of-the-meter energy assets within a single platform, incorporating costs like the IPP service margin and required infrastructure upgrades. As a result, Xendee delivered an optimal, cost-minimizing technology mix for each potential site that met all net-zero and load requirements, providing a clear analysis of the benefits for both the client and the IPP.