Case Study: Flex achieves 20% capacity increase and improved quality control with WorkClout

A WorkClout Case Study

Preview of the Flex Case Study

Flex leverages WorkClout’s workflow management system to ensure quality control with every run

Flex, a flexible packaging manufacturer serving over 1,000 customers since 2013, was managing production with paper and Excel, which led to missed communications, poor visibility into job status, and quality defects that caused waste and rework. To solve these issues, Flex turned to WorkClout’s workflow management system to centralize notifications, job tracking, and quality control.

WorkClout implemented visual workflow management, production scheduling, custom notifications and tags, and floor reporting with operator portals and custom QC forms so jobs update status in real time and defects are logged immediately. As a result, Flex saw higher on-time job completion, improved quality rates, shorter lead times, and an average increase of about 20% in overall capacity after using WorkClout for over six months.


Open case study document...

WorkClout

7 Case Studies