Wood Group was selected by a major operator in the Middle East to upgrade an existing low-elevated candle flare system at a degassing station. The brownfield project's challenge was to improve environmental performance to meet regulatory standards by achieving a cleaner flame, all while operating within a congested plant with limited space and avoiding prolonged production shutdowns.
Wood implemented a unique design that connected existing valves at grade to a new independent low-pressure flare system with a knockout drum, an elevated stack, and strategically located air blowers. This solution enabled Wood to complete the project from concept to start-up in two years, which was 100% faster than traditional timelines. The results included the complete removal of black smoke, full regulatory compliance, and the maintenance of production throughout the construction phase.