AVEVA partnered with The Venetian and Palazzo — the world’s largest resort (67 acres, ~14 million sq ft) — to solve a critical operational challenge: keep power continuously available across a sprawling campus with 66 substations, 62 PLCs and distributed staff. Any outage jeopardized guest experience, revenue and sustainability goals, so the resort needed real‑time visibility, redundancy and centralized control to prevent disruptions.
AVEVA’s solution (InTouch HMI, Historian and integration with PLCs) delivers real‑time monitoring, automatic redundancy, load shedding and generator oversight from a central station. The result: 24/7/365 reliable power, faster proactive troubleshooting, fewer site visits and lower operating costs, while supporting the resort’s green/LEED objectives.