Case Study: Geophysical Survey Systems boosts on-time deliveries to 90% and halves lead times with WM Synergy

A WM Synergy Case Study

Preview of the Geophysical Survey Systems Case Study

Geophysical Survey Systems cuts production time with Infor VISUAL

Geophysical Survey Systems, a Salem, New Hampshire manufacturer of ground-penetrating radar and inspection equipment, faced limited data visibility, long lead times, material shortages, and slipping on-time delivery while competing in a tight market. Working with WM Synergy, the company implemented the Infor VISUAL ERP solution to provide real-time, single-source visibility across sales, operations, and manufacturing and to streamline business processes.

WM Synergy’s Infor VISUAL deployment cut average lead times from four weeks to two, enabled orders to ship 50% faster, and raised on-time delivery from about 60% to over 90%. The solution also reduced inventory and material shortages, improved labor and material control, enhanced customer satisfaction and new business, and increased revenues and profits without adding headcount.


Open case study document...

Geophysical Survey Systems

Jack O'leary

VP of Operations


WM Synergy

71 Case Studies