WinMan ERP
35 Case Studies
A WinMan ERP Case Study
Westin Design, a long-established manufacturer of kitchen extractors, faced challenges with inaccurate delivery dates, inefficient warehouse operations, and a high rate of picking errors, which resulted in an on-time delivery rate of only 50%.
By implementing the WinMan ERP system, including its production scheduler and WinMan Go mobile warehouse apps, the company gained an integrated solution that provided accurate due dates and streamlined processes. As a result, WinMan helped Westin Design dramatically increase its on-time delivery to 99%, cut stockholding by £50,000 to improve cash flow, reduce stock-taking time by half, and completely eliminate picking errors.