Case Study: Siemens halves engineering costs and beats time-to-market with Wind River VxWorks

A Wind River Case Study

Preview of the Siemens Case Study

Siemens halves engineering costs with Wind River VxWorks and ships 4 months early

Siemens, a market leader in industrial PCs, faced the challenge of maintaining its costly and difficult-to-support homegrown real-time operating system for its high-performance computers. The company needed a proven commercial RTOS to ensure determinism, fast response times, and safety. Siemens turned to vendor Wind River and its VxWorks RTOS to replace its in-house system.

By implementing Wind River's VxWorks, Siemens eliminated numerous development steps. The solution provided the required safety, security, and reliability, along with optimal compatibility with Intel hardware. As a result, Siemens cut its engineering costs by 50% compared to its previous system and released its product four months ahead of schedule.


View this case study…

Siemens

Anton Sauter

Product Manager SIMATIC IPC, Siemens Industrial PC Group


Wind River

60 Case Studies