Wärtsilä Energy
63 Case Studies
A Wärtsilä Energy Case Study
The customer, Enertrag AG, a German wind developer and operator, faced the challenge of providing frequency regulation and grid balancing services to the German grid. Partnering with vendor Wärtsilä Energy, they utilized the GEMS Digital Energy Platform to intelligently manage a 22 MW / 35 MWh energy storage facility.
Wärtsilä's GEMS platform provided the solution by integrating and optimizing multiple generation assets to deliver frequency control, energy arbitrage, and reactive power services. This allowed the project to participate in Germany’s PRL market from day one, generating revenue while ensuring grid reliability and stability by optimizing intermittent wind power.