Case Study: Antigua Power Company achieves faster spare parts handling and maintenance planning with Wärtsilä Online from Wärtsilä Energy

A Wärtsilä Energy Case Study

Preview of the EDG Case Study

EDG ensures 78.5 MW power reliability with Wärtsilä Energy

Antigua Power Company, an independent power producer supplying 80% of the electricity for Antigua and Barbuda, needed reliable 24/7 generation capacity and better access to technical information for its Wärtsilä power plants. The challenge was to streamline spare parts handling and troubleshooting to ensure efficient maintenance planning for its critical power generation assets.

Wärtsilä implemented its Wärtsilä Online services portal for the customer. This solution provided APC with 24/7 access to equipment-specific technical documentation, a knowledge base, and the ability to instantly check spare parts availability and prices. The results included more efficient maintenance planning and significant time savings for plant operators, supporting the plant's total output of 78.5 MW.


View this case study…